Germany – Ventilation installation work – SV-JWA-260818-003 - UPS Project - Renewal of the Telecommunications Power Supply_Package_3B, Ventilation Technology
UPS Project - Renewal of the Telecommunications Power Supply_Package_3B, Ventilation Technology Basic ventilation is provided for each of the UPS and SiBel rooms in order to specifically remove all contaminant loads and always ensure the required minimum air ex
Opportunity description
UPS Project - Renewal of the Telecommunications Power Supply_Package_3B, Ventilation Technology Basic ventilation is provided for each of the UPS and SiBel rooms in order to specifically remove all contaminant loads and always ensure the required minimum air exchange. To dissipate the heat loads, air from the track area is used for cooling. Control is temperature-dependent and continuously variable between basic and peak ventilation. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.