Germany – Ventilation installation work – TUD MOL 3. TBM Mollier Building Renovation
Ventilation technology - 1 rooftop air-handling unit 14400 m³/h with integrated cooling - approx. 200 m² of air ducts and approx. 90 sqm of fittings - insulation work, inside and outside - approx. 402 m² of fire-protection cladding with L90 fittings - 8 supply-air and 4 exhaust-air outlets - approx.
Opportunity description
Ventilation technology - 1 rooftop air-handling unit 14400 m³/h with integrated cooling - approx. 200 m² of air ducts and approx. 90 sqm of fittings - insulation work, inside and outside - approx. 402 m² of fire-protection cladding with L90 fittings - 8 supply-air and 4 exhaust-air outlets - approx. 18 m of insulated DN 200 stainless-steel exhaust pipe Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.