Germany – Woodwork – HD, University, New Construction of Life-inspired Engineering Molecular Systems (LEMS), 1st Construction Phase, Carpentry and Timber Construction Work
Carpentry and timber construction work Non-load-bearing exterior timber walls in F30-B frame construction on 5 above-ground floors. Installed floor by floor in the reinforced concrete shell. Rear-ventilated timber cladding made of larch wood and glass-fiber-reinforced concrete cladding. Proje
Opportunity description
Carpentry and timber construction work Non-load-bearing exterior timber walls in F30-B frame construction on 5 above-ground floors. Installed floor by floor in the reinforced concrete shell. Rear-ventilated timber cladding made of larch wood and glass-fiber-reinforced concrete cladding. Projecting glued laminated timber larch profiles 18/12, arranged offset on each level. Steel substructure on surrounding precast concrete balconies as a support structure for the glued laminated timber profiles. approx. 1,755 m² F30-B timber frame construction (144 elements) approx. 1,330 m² rear-ventilated timber cladding approx. 75 m² smooth glass-fiber-reinforced concrete cladding approx. 135 m² textured glass-fiber-reinforced concrete cladding 787 pcs. glued laminated timber profiles L = 3.8 m to 4.2 m approx. 640 m steel support structure Procedure: open. Estimated value: 1,785,670.31 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.