Germany – Works for complete or part construction and civil engineering work – Construction of a multifunctional multi-purpose building - New construction of the “GUT Drauf Complex” Lot 22.2 Construction cleaning after completion
Construction of a multifunctional multi-purpose building - New construction of the “GUT Drauf Complex” Lot 22.2 Construction cleaning after completion Title 01: Floors and stair coverings PUR resin screed floors (indoors): 145 m²; Mastic asphalt surfaces: 1,260 m² ; S
Opportunity description
Construction of a multifunctional multi-purpose building - New construction of the “GUT Drauf Complex” Lot 22.2 Construction cleaning after completion Title 01: Floors and stair coverings PUR resin screed floors (indoors): 145 m²; Mastic asphalt surfaces: 1,260 m² ; Sports flooring (sealed linoleum): 1,347 m²; Tiled floors (R10 and R12): 1,012 m²; PU plastic coatings: 287.5 m²; Supplement: Wet scrubbing of heavily soiled surfaces: 345 m² Removal of protective coverings (PE film, painter’s fleece, etc.): 172.5 m²; Cold room floors (stainless steel surface): 55 m²: Title 02: Interior doors and interior glazing Interior doors (single-leaf, solid particleboard/laminate): 33 units; Corridor doors (double-leaf, T30/T90/RS): 5 units Interior doors as sliding doors (single-leaf): 3 units Supplement: Vision panels (up to 1.00 m²): 12 units Steel doors (single-leaf, T30/T90/RS, painted): 22 units Steel doors (double-leaf, T30/T90/RS, painted): 11 units Cold room doors (single-leaf): 7 units Interior windows (fixed glazing elements and transoms): 11.5 m² Partition wall systems (steel/aluminum and solid particleboard): 119 m² Interior gates (in the gymnasium): 18.4 m² (equivalent to 4 units) Title 03: Windows, exterior doors and roof glazing Single-leaf window surfaces (up to 0.70 x 1.80 m): 6 units Single-leaf window surfaces (approx. 2.00 x 1.35 m): 7 units Single-leaf window surfaces (up to 2.20 x 1.80 m): 7 units Single-leaf exterior doors (up to 1.10 x 2.25 m): 4 units Exterior doors (up to 2.20 x 2.25 m): 4 units Exterior doors with transom (up to 2.50 x 2.90 m): 2 units Post-and-beam façades (incl. glass and metal profiles): 308.2 m² (4 façade areas) SHEV skylight domes in the roof area (working height approx. 11 m): 6 units SHEV skylight domes in the roof area (working height approx. 5 m): 6 units Title 04: Sanitary fixtures Wall surfaces with ceramic tiles: 2,346 m² Sanitary partitions (incl. 47 doors): 215 m² Washdown toilets (sanitary porcelain): 26 units Urinal bowls: 10 units Washbasins: 46 units Wash/sink basins: 2 units Wall mirrors (from 0.25 m²): 42 units Title 05: Supply facilities Preparation kitchen (furniture and appliances): 1 lump-sum cleaning (3 rows of approx. 5.20 m each + appliances) Dry storage (9 stainless steel shelves, approx. 14.6 linear m): 1 lump-sum cleaning Special-diet kitchen (furniture rows approx. 8 linear m + appliances): 1 lump-sum cleaning Cold kitchen (furniture rows approx. 10 linear m + appliances): 1 lump-sum cleaning Container storage (8 stainless steel shelves, approx. 10 linear m): 1 lump-sum cleaning Serving kitchen (furniture rows approx. 24 linear m + 4.20 linear m wall cabinets): 1 lump-sum cleaning Buffet (3 buffet rows + 4 dish-return units): 1 lump-sum cleaning Beverage storage (6 stainless steel shelves, approx. 7.1 linear m): 1 lump-sum cleaning Dishwashing kitchen (furniture row approx. 7.30 m + 4.20 linear m wall cabinets + appliances): 1 lump-sum cleaning Cold rooms (wall and ceiling surfaces): 201 m² (50 m² ceiling, 151 m² wall) Storage shelves in cold rooms (21 shelves in 5 rooms, approx. 28 linear m): 21 units Title 06: Furnishings and built-in fixtures Impact walls in the multi-purpose hall (needle felt/multiplex): 304.5 m² (length approx. 145 m, height approx. 205 cm) Stage cladding in the hall (wood/multiplex): 1 lump-sum cleaning (6 x 8 m stage) CEE distribution boxes (plastic-coated): 9 units Mobile room dividers (wood/multiplex): 2 units Benches in the foyer (projected floor area): 21 m² Folding shutters for control-room window in hall: 1 unit Title 07: Metal objects Metal pipes DN 15 to DN 32 (up to 4.00 m height): 220 m Metal pipes DN 40 to DN 80 (up to 4.00 m height): 220 m Metal pipes DN 100 to DN 120: 220 m Metal pipes DN 150 to DN 250: 220 m Control, switchgear, SHEV and hydrant cabinets: 7 units Title 08: Miscellaneous (hours / disposal) Required hours for skilled workers: 18 h Required hours for construction helpers: 18 h Sunday and public holiday supplement for skilled workers: 18 h Sunday and public holiday supplement for construction helpers: 18 h Disposal of mixed construction waste: 1,000 kg Disposal of construction rubble: 1,000 kg Disposal of packaging material: 1,000 kg Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.