Germany – Works for complete or part construction and civil engineering work – Renovation and conversion of Süd Primary School, Altötting LV_03_Master builder works
Site setup incl., among other things, break container. Washing and toilet rooms, approx. 215 m construction fence, water supply system, fall protection, approx. 21 m pedestrian tunnel and 366 rn3 gravel areas for site setup, construction power distributor, site
Opportunity description
Site setup incl., among other things, break container. Washing and toilet rooms, approx. 215 m construction fence, water supply system, fall protection, approx. 21 m pedestrian tunnel and 366 rn3 gravel areas for site setup, construction power distributor, site lighting - Demolition works, outdoor facilities: approx. 84 m steps and walls, approx. 754 rn path edging, approx. 1.000 m2 paving surfaces and EPDM, strip approx. 1.000 m2 topsoil, dismantle sports and playground equipment- Demolition works, existing building: 22 door and window openings, relocate and change the height of 9 doors, approx. 110 MEP openings, demolition of approx. 111 m2 blinding concrete - Earthworks: approx. 5.175 m3 excavation, partial backfilling and 2 0/2 1.1/ VK 1/2 2, approx. 17 m3 earth excavation in the building - External drainage sewer works and below new floor slabs approx. 453 m, 136 m below existing floor slab - approx. 142 m3 HDI underpinning - approx. 650 m grounding system for sports hall - Concrete works, partly with exposed-concrete requirements: approx. 926 m2 cast-in-place concrete floor slabs, watertight concrete, approx. 385 m2 watertight-concrete external walls, approx. 546 m2 cast-in-place concrete external walls, approx. m2 internal walls, approx. 32 rn round columns, approx. 871 rn2 reinforced-concrete ceilings, approx. 400 m2 double-wall elements, approx. 52 m2 surface treatment of exposed-concrete ceilings, approx. 450 rnz reinforced-concrete filigree ceiling in composite construction with timber beams provided by the client, precast stair systems over 1 and 4 storeys respectively - Concrete works in the existing building: 2 internal columns incl. foundations, approx. 106 rn2 floor slab in the building as an addition and approx. 207 m2 area floor slab respectively, approx. 45 rn2 new reinforced-concrete ceilings, approx. 26 m2 closing of openings, approx. 135 m reinforced-concrete lintels over window openings, approx. 140 m internal columns and pillars - Masonry works: approx. 404 m2 masonry in various thicknesses, approx. 134 rn2 masonry added/completed - Insulation works: approx. 1.243 rn2 XPS perimeter insulation - Plastering works: approx. 2.656 m2 internal plaster, approx. 77 rn2 base plaster - Winter construction measures for approx. 846 m2 floor slabs, approx. 1.134 m2 external and internal walls, and approx. 1.004 m2 cast-in-place concrete ceilings Site setup incl., among other things, break container. Washing and toilet rooms, approx. 215 m construction fence, water supply system, fall protection, approx. 21 m pedestrian tunnel and 366 rn3 gravel areas for site setup, construction power distributor, site lighting - Demolition works, outdoor facilities: approx. 84 m steps and walls, approx. 754 rn path edging, approx. 1.000 m2 paving surfaces and EPDM, strip approx. 1.000 m2 topsoil, dismantle sports and playground equipment- Demolition works, existing building: 22 door and window openings, relocate and change the height of 9 doors, approx. 110 MEP openings, demolition of approx. 111 m2 blinding concrete - Earthworks: approx. 5.175 m3 excavation, partial backfilling and 2 0/2 1.1/ VK 1/2 2, approx. 17 m3 earth excavation in the building - External drainage sewer works and below new floor slabs approx. 453 m, 136 m below existing floor slab - approx. 142 m3 HDI underpinning - approx. 650 m grounding system for sports hall - Concrete works, partly with exposed-concrete requirements: approx. 926 m2 cast-in-place concrete floor slabs, watertight concrete, approx. 385 m2 watertight-concrete external walls, approx. 546 m2 cast-in-place concrete external walls, approx. m2 internal walls, approx. 32 rn round columns, approx. 871 rn2 reinforced-concrete ceilings, approx. 400 m2 double-wall elements, approx. 52 m2 surface treatment of exposed-concrete ceilings, approx. 450 rnz reinforced-concrete filigree ceiling in composite construction with timber beams provided by the client, precast stair systems over 1 and 4 storeys respectively - Concrete works in the existing building: 2 internal columns incl. foundations, approx. 106 rn2 floor slab in the building as an addition and approx. 207 m2 area floor slab respectively, approx. 45 rn2 new reinforced-concrete ceilings, approx. 26 m2 closing of openings, approx. 135 m reinforced-concrete lintels over window openings, approx. 140 m internal columns and pillars - Masonry works: approx. 404 m2 masonry in various thicknesses, approx. 134 rn2 masonry added/completed - Insulation works: approx. 1.243 rn2 XPS perimeter insulation - Plastering works: approx. 2.656 m2 internal plaster, approx. 77 rn2 base plaster - Winter construction measures for approx. 846 m2 floor slabs, approx. 1.134 m2 external and internal walls, and approx. 1.004 m2 cast-in-place concrete ceilings Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.