Germany – Works related to water-distribution pipelines – Drinking Water Treatment Plant (TWA) Eiweiler - Submeasure: Supply Pipeline to the Drinking Water Treatment Plant (TWA), 3rd Construction Phase (Forest Area)
The Talsperrenverband Nonnweiler (TVN) plans to construct a raw water pipeline from its service water pipeline (BWL DN 1000) in Primstal to the Eiweiler drinking water treatment plant currently under construction (TWA Eiweiler) and to the Primstal pressure boosting pl
Opportunity description
The Talsperrenverband Nonnweiler (TVN) plans to construct a raw water pipeline from its service water pipeline (BWL DN 1000) in Primstal to the Eiweiler drinking water treatment plant currently under construction (TWA Eiweiler) and to the Primstal pressure boosting plant (DEA Primstal). Procurement unit VE10_2 - Pipeline construction, earthworks essentially includes the following construction works: • Site setup and work in the construction area • Traffic safety and traffic control • Safety and preparatory works • approx. 480 m² of shoring works • approx. 2,600 m of DN 600 pipeline construction • excavation of approx. 6,990 m³ of soil for the water pipeline trench • approx. 2,602 m of cable protection conduits • Inspection works • Reinstatement works Procedure: open. Estimated value: 2,620,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.