Germany – Workshops construction work – Ingelheim wastewater treatment plant, new workshop and social building, technical building equipment (TGA)
The construction project involves the new construction of a workshop and social building on the grounds of the "Untere Selz" wastewater treatment plant in Ingelheim. The wastewater treatment plant is located at 55218 Ingelheim Aussenliegend 122. The building is being newly constructed, the bu
Opportunity description
The construction project involves the new construction of a workshop and social building on the grounds of the "Untere Selz" wastewater treatment plant in Ingelheim. The wastewater treatment plant is located at 55218 Ingelheim Aussenliegend 122. The building will be newly constructed; the building consists of 2 floors (ground floor and 1st upper floor) as well as a roof area that is used in parts. The building length is approx. 54m, the building width approx. 23m. The floor height is approx. 4m in each case. Certain room-enclosing surfaces must meet fire protection requirements; the corresponding walls and ceilings can be found in the fire protection concept. The upper floor is accessed by means of an internal staircase. The building is used as a social and workshop building. Various workshops are located on the ground floor and 1st upper floor; some of the workshops extend across floors. Sanitary: - 430m wastewater pipe, fittings, insulation - 2200m drinking water pipe, fittings, insulation, fire seals - 80 pcs valves - 59 pcs various fixtures, valves - 195m² drywall pre-wall or shaft with fixture carriers and valve connections - 375m compressed-air pipe, fittings, valves - Heating: - 1030m heating pipe, fittings, insulation, fire sealing - 1 pc domestic hot-water preparation fresh-water station, storage tank - 1 pc district-heating station - 1 pc pressure-maintenance system - 1 pc manifold, 4 heating circuits, pumps, valves - 38 pcs panel radiators, valve set, connection block - 5 pcs infrared heating panels, ceiling installation, control, - 10 pcs radiant ceiling panels, control Ventilation: - 3 pcs ventilation units up to 3500m³/h, roof-mounted, control, dampers - 2 pcs fans up to 600m³/h, indoor installation, control, dampers - 100 pcs outlets - 33 pcs fire dampers - 58 pcs dampers, throttles - 67 pcs silencers - 665m² ductwork, fittings, insulation - 585m spiral-seam pipe DN80-DN355, fittings, insulation - 3 pcs inverter units, 18kW heating/cooling capacity - 2 pcs inverter units, 33kW cooling capacity - 2 pcs inverter units, 5kW cooling capacity - 18 pcs recirculating-air cooling units - 400m refrigerant line DN6-DN25, fittings, insulation, fire seals TGA-MSR: - 38 pcs field devices - 1 pc control cabinet - 1 pc automation station - 1 pc services (design, programming, commissioning) Procedure: open. Estimated value: 1,249,792.43 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.