Netherlands – Masts – Supply of Overhead Line Masts and Drilling Pipes
This contract includes the continuous, predictable, and timely supply of overhead line masts and associated drilling pipes (tubular foundations) for the tram and metro overhead line network, which has a length of approximately 250 kilometers. Objec
Opportunity description
This contract includes the continuous, predictable, and timely supply of overhead line masts and associated drilling pipes (tubular foundations) for the tram and metro overhead line network, which has a length of approximately 250 kilometers. Objective of the Contract: The primary objective is for GVB to have access to the required materials throughout the entire term of the Framework Agreement. This must take place under the following conditions: Market-conformant and transparent prices: Prices must be in line with the current market and fully transparent. Compliance with the Schedule of Requirements: All supplied materials must strictly comply with the specifications set out in the Schedule of Requirements. High delivery reliability: Consistent and reliable delivery is crucial to ensure operational continuity. Compliance with agreed delivery times: Deliveries must be made punctually within the af see Price Sheet See Schedule of Requirements see price sheet Procedure: open. Estimated value: 3,120,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.