Netherlands – Works for complete or part construction and civil engineering work – Stations - Construction of Zwolle North Entrance and platform canopies
Part of the scope of the construction of the Zwolle North Entrance and platform canopies (non-exhaustive): 1. Circular dismantling of the existing canopy and platform canopies, with the harvesting, testing and processing of released materials for appli
Opportunity description
Part of the scope of the construction of the Zwolle North Entrance and platform canopies (non-exhaustive): 1. Circular dismantling of the existing canopy and platform canopies, with the harvesting, testing and processing of released materials for use in the new construction of the North Entrance and the Kamper Line platform canopy, based on the final design 2. Dismantling the existing shops. 3. Construction of the North Entrance in wood and modular, circular and biobased materials 4. Construction of sustainable and circular platform canopies for the Emmer and Kamper Lines 5. Construction of retail shells 6. Mechanical, electrical and telecommunications installations, including rainwater infiltration 7. Coordinating the installation of OVC&P gates and equipment, whereby the necessary materials and systems will be installed under parallel contracts 8. Modification of overhead lines and tensioning structures The objective of the project is to create a spacious, high-quality and sustainable North Entrance and platform canopies on the Emmer and Kamper Lines. see procurement dossier Part of the scope of the construction of the Zwolle North Entrance and platform canopies (non-exhaustive): 1. Circular dismantling of the existing canopy and platform canopies, with the harvesting, testing and processing of released materials for use in the new construction of the North Entrance and the Kamper Line platform canopy, based on the final design 2. Dismantling the existing shops. 3. Construction of the North Entrance in wood and modular, circular and biobased materials 4. Construction of sustainable and circular platform canopies for the Emmer and Kamper Lines 5. Construction of retail shells 6. Mechanical, electrical and telecommunications installations, including rainwater infiltration 7. Coordinating the installation of OVC&P gates and equipment, whereby the necessary materials and systems will be installed under parallel contracts 8. Modification of overhead lines The objective of the project is to create a spacious, high-quality and sustainable North Entrance and platform canopies on the Emmer and Kamper Lines. see selection guide and procurement dossier Procedure: restricted. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.