Poland – Construction supervision services – Investor supervision service for the task entitled Construction and conservation works as part of the project entitled “A modern museum within historic walls – increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn – a Historic Monument bearing witness to the activities of Nicolaus Copernicus”
1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic
Opportunity description
1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. The subject matter of the contract consists of 8 (eight) parts: 1) Part No. 1 – Investor supervision inspector for construction works and coordinator of works supervision inspectors for all disciplines; 2) Part No. 2 – Investor supervision inspector for sanitary works; 3) Part No. 3 – Investor supervision inspector for electrical works; 4) Part No. 4 – Investor supervision inspector for telecommunications works; 5) Part No. 5 – Supervision inspector for conservation works on brick facing, stone and architectural details; 6) Part No. 6 – Greenery supervision inspector; 7) Part No. 7 – Archaeological supervision inspector; 8) Part No. 8 – Supervision inspector specialising in geotechnics, concerning earthworks and foundation works for the library in the western zwinger. 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 1 – Investor supervision inspector for construction works and coordinator of works supervision inspectors for all disciplines; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 2 – Investor supervision inspector for sanitary works; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 3 – Investor supervision inspector for electrical works; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 4 – Investor supervision inspector for telecommunications works; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 5 – Supervision inspector for conservation works on brick facing, stone and architectural details; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 6 – Greenery supervision inspector; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 7 – Archaeological supervision inspector; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. 1. The subject matter of the contract is the comprehensive provision of investor supervision services over construction works, conservation works and accompanying works carried out as part of the investment task entitled “A modern museum within historic walls - increasing the tourist attractiveness of the Castle of the Warmian Cathedral Chapter in Olsztyn - a Historic Monument bearing witness to the activities of Nicolaus Copernicus”. 2. Part No. 8 – Supervision inspector specialising in geotechnics, concerning earthworks and foundation works for the library in the western zwinger; 3. The detailed scope of duties for the individual parts of the contract is set out in the Description of the Subject Matter of the Contract, constituting Annex No. 1 to the draft contract. The draft contract constitutes Annex No. 7 to the SWZ. 4. The Contracting Authority informs that the supervised construction works will be carried out under a construction works contract in which: 1) the construction works contractor’s remuneration is lump-sum for construction works and cost-estimate-based for conservation works on polychrome plasterwork, 2) the task is carried out under the “build” system, 3) the design documentation, the SWZ together with the model contract and the other documents concerning the construction works procedure are available on the website of the procedure at: https://muzeum-olsztyn.logintrade.net/zapytania_email,230203,14f0a1603c452ecf7bcd567e7185852a.html 4) investor supervision, despite the division of this contract into parts, requires ongoing interdisciplinary coordination, and the detailed scope of works covered by the EU project and carried out outside the EU project has been specified in the documentation for the construction works procedure. 5. The Contracting Authority reserves the requirement that the contractor personally perform the key tasks comprising the subject matter of the contract in each part, within the scope specified in the Description of the Subject Matter of the Contract, hereinafter “OPZ”, excluding the following auxiliary activities: 1) maintaining a register of the contractor’s subcontractors and carrying out inspections and monitoring of the works contractor’s subcontractors, 2) archiving the task being carried out in electronic form, including digital reproduction of the documentation, or in another form agreed with the Contracting Authority, 3) preparing, in cooperation with the Contracting Authority, documents and information for the purposes of settlements and inspections of the EU project, within the scope specified in the documentation for the public procurement procedure for construction works, in particular in Annex No. 8 to the SWZ - model contract in the construction works procedure. Procedure: open. Estimated value: 2,208,480 PLN. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.