Poland – Construction work – Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), the GPO-C substation building (110 kV/15 kV), generator station buildings and 110 kV cable lines connecting the Port Polska investment to the national power grid
The subject of the contract is: “Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/ 15 kV), the GPO-C substation building (110 kV/ 15 kV), generator station buildings and 110 kV cable lines connecting the inves
Opportunity description
The subject of the contract is: “Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/ 15 kV), the GPO-C substation building (110 kV/ 15 kV), generator station buildings and 110 kV cable lines connecting the Port Polska investment to the national power grid”. The subject of the contract has been divided into 7 Tasks, with all Tasks to be covered by a single Contract. The detailed subject of the contract has been described in the Description of Needs and Requirements (OPW). I. The subject of the contract is: “Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/ 15 kV), the GPO-C substation building (110 kV/ 15 kV), generator station buildings and 110 kV cable lines connecting the Port Polska investment to the national power grid”. The subject of the contract has been divided into 7 Tasks, with all Tasks to be covered by a single Contract. II. Division of the Contract into Tasks: 2.1. Task 1 - performance of construction works and necessary design works for the connection to the PGE 110/110 kV Substation, together with 110 kV lines on the eastern and southern sides of the airport; 2.2. Task 2 - performance of construction works and necessary design works for the Distribution Supply Point substation: RPZ-1, together with the SCADA system; 2.3. Task 3 - performance of construction works and necessary design works for the Distribution Supply Point substation: RPZ-2, together with the SCADA system; 2.4. Task 4 - performance of construction works and necessary design works for the Distribution Supply Point substation: RPZ-3, together with the SCADA system; 2.5. Task 5 - performance of construction works and necessary design works for the Distribution Supply Point substation: RPZ-4, together with the SCADA system; 2.6. Task 6 - performance of construction works and necessary design works for the connection to the PSE 400/110 kV Substation, together with 110 kV lines on the western and northern sides of the airport; 2.7. Task 7 - performance of construction works and necessary design works for the GPO-C substation, together with the connection to the 110 kV grid and the SCADA system. III. The detailed subject of the contract has been described in the OPW. Procedure: comp-dial. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.