Poland – Construction work for power plant – Execution of construction works under a design-and-build formula: Design, supply and construction of: a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW; a photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW; Design, supply and construction of an Electrical Energy Storage Facility named ME Skalin 1 with an installed capacity of 4.472 MW; ME Gryfice 2 with an installed capacity of
The subject of the contract is the comprehensive implementation of the task entitled: “Design, supply and construction of a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW,; 2. Design, supply and construction of a photovoltaic installation p
Opportunity description
The subject of the contract is the comprehensive implementation of the task entitled: “Design, supply and construction of a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW,; 2. Design, supply and construction of a photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW; 3. Design, supply and construction of an Electrical electrical Energy energy Storage Facility named ME Skalin 1 with an installed capacity of 4.472 MW and m; 4. Design, supply and construction of an Electrical electrical Energy energy Storage Facility named ME Gryfice 2 with an installed capacity of 8.944 MW”. The subject of the contract comprises 4 tasks for the execution of construction works under a design-and-build formula: Task 1: “Design, supply and construction of a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW”, financed under the National Recovery and Resilience Plan (KPO), G3.1.4. “Support for the national energy system (Energy Support Fund) Task 2: “Design, supply and construction of a photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW” financed under the National Recovery and Resilience Plan (KPO), G3.1.4. “Support for the national energy system (Energy Support Fund)” For Tasks 1 and 2, the subject of the contract is the comprehensive execution of construction and electrical works and the necessary design work relating to the design, redesign, construction and supply of the following photovoltaic installations: “PV Skalin 1” with an installed capacity of up to 5.61 MW and “PV Gryfice 2” with an installed capacity of up to 9 MW, together with the construction of MV cable lines along with fiber-optic lines. Task 3: “Design, supply and construction of an Electrical Energy Storage Facility named ME Skalin 1 with an installed capacity of 4.472 MW”, for which an agreement has been signed for co-financing the implementation of the Investment named “Energy storage facilities: Skalin and Gryfice 2” from NFOŚiGW funds accumulated in the Modernisation Fund account in the form of a grant Task 4: “Design, supply and construction of an Electrical Energy Storage Facility named ME Gryfice 2 with an installed capacity of 8.944 MW”, for which an agreement has been signed for co-financing the implementation of the Investment named “Energy storage facilities: Skalin and Gryfice 2” from NFOŚiGW funds accumulated in the Modernisation Fund account in the form of a grant For Task 3 and Task 4 – the subject of the contract is the implementation of an investment project involving the construction of electrical energy storage facilities (hereinafter: MEE), together with internal cabling and the necessary infrastructure and installations, accompanying systems, and connection to newly designed 15/0.8 kV electrical substations. The storage facilities will operate in conjunction with the newly designed installations (Tasks 1 and 2). Construction of the ME Skalin 1 and ME Gryfice 2 electrical energy storage facilities with a total capacity of 13 416 kW and storage capacity of 26 832 kWh. The installations will consist of: MEE Skalin 1 • 2 storage units, each with a rated capacity of 2 236 kW and storage capacity of 4 472 kWh, integrated with the newly designed PV Skalin 1 photovoltaic farm with a capacity of 5.61 MW. The storage facilities will operate as a hybrid installation because, in accordance with the connection conditions obtained, it may also draw electricity from the grid. The energy storage facility will be connected to a newly designed containerized transformer substation. MEE Gryfice 2 • 4 storage units, each with a rated capacity of 2 236 kW and storage capacity of 4 472 kWh, integrated with the newly designed PV Gryfice 2 photovoltaic farm with a capacity of 9 MW. The storage facilities will operate as a hybrid installation because, in accordance with the connection conditions obtained, it may also draw electricity from the grid. The storage facility will be connected to newly designed MV/LV transformer substations. The designed Skalin 1 and Gryfice 2 energy storage systems will be located within the planned PV farms – in the immediate vicinity of the planned transformer substations. The planned locations will have access to electrical power, road and service infrastructure. The site will be fenced, monitored and excluded from general public use. The subject of the contract is the comprehensive implementation of the task entitled: “Design, supply and construction of a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW,; 2. Design, supply and construction of a photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW; 3. Design, supply and construction of an Electrical electrical Energy energy Storage Facility named ME Skalin 1 with an installed capacity of 4.472 MW and m; 4. Design, supply and construction of an Electrical electrical Energy energy Storage Facility named ME Gryfice 2 with an installed capacity of 8.944 MW”. The subject of the contract comprises 4 tasks for the execution of construction works under a design-and-build formula: Task 1: “Design, supply and construction of a photovoltaic installation named PV Skalin 1 with an installed capacity of up to 5.61 MW”, financed under the National Recovery and Resilience Plan (KPO), G3.1.4. “Support for the national energy system (Energy Support Fund) Task 2: “Design, supply and construction of a photovoltaic installation named PV Gryfice 2 with an installed capacity of up to 9 MW” financed under the National Recovery and Resilience Plan (KPO), G3.1.4. “Support for the national energy system (Energy Support Fund)” For Tasks 1 and 2, the subject of the contract is the comprehensive execution of construction and electrical works and the necessary design work relating to the design, redesign, construction and supply of the following photovoltaic installations: “PV Skalin 1” with an installed capacity of up to 5.61 MW and “PV Gryfice 2” with an installed capacity of up to 9 MW, together with the construction of MV cable lines along with fiber-optic lines. Task 3: “Design, supply and construction of an Electrical Energy Storage Facility named ME Skalin 1 with an installed capacity of 4.472 MW”, for which an agreement has been signed for co-financing the implementation of the Investment named “Energy storage facilities: Skalin and Gryfice 2” from NFOŚiGW funds accumulated in the Modernisation Fund account in the form of a grant Task 4: “Design, supply and construction of an Electrical Energy Storage Facility named ME Gryfice 2 with an installed capacity of 8.944 MW”, for which an agreement has been signed for co-financing the implementation of the Investment named “Energy storage facilities: Skalin and Gryfice 2” from NFOŚiGW funds accumulated in the Modernisation Fund account in the form of a grant For Task 3 and Task 4 – the subject of the contract is the implementation of an investment project involving the construction of electrical energy storage facilities (hereinafter: MEE), together with internal cabling and the necessary infrastructure and installations, accompanying systems, and connection to newly designed 15/0.8 kV electrical substations. The storage facilities will operate in conjunction with the newly designed installations (Tasks 1 and 2). Construction of the ME Skalin 1 and ME Gryfice 2 electrical energy storage facilities with a total capacity of 13 416 kW and storage capacity of 26 832 kWh. The installations will consist of: MEE Skalin 1 • 2 storage units, each with a rated capacity of 2 236 kW and storage capacity of 4 472 kWh, integrated with the newly designed PV Skalin 1 photovoltaic farm with a capacity of 5.61 MW. The storage facilities will operate as a hybrid installation because, in accordance with the connection conditions obtained, it may also draw electricity from the grid. The energy storage facility will be connected to a newly designed containerized transformer substation. MEE Gryfice 2 • 4 storage units, each with a rated capacity of 2 236 kW and storage capacity of 4 472 kWh, integrated with the newly designed PV Gryfice 2 photovoltaic farm with a capacity of 9 MW. The storage facilities will operate as a hybrid installation because, in accordance with the connection conditions obtained, it may also draw electricity from the grid. The storage facility will be connected to newly designed MV/LV transformer substations. The designed Skalin 1 and Gryfice 2 energy storage systems will be located within the planned PV farms – in the immediate vicinity of the planned transformer substations. The planned locations will have access to electrical power, road and service infrastructure. The site will be fenced, monitored and excluded from general public use. The detailed scope of work is contained in the PFU for each Task separately and in the draft Agreement. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.