Poland – Construction work – Preparation of design documentation and execution of construction works for the "Energy" subsystem – overhead contact line on railway line No. 85, Warsaw–Łódź section
The subject of the Contract is the preparation of Design Documentation and the execution of construction works aimed at constructing the overhead contact line, together with power supply components, autotransformer cabins and control of the KDP overhead contact line switches
Opportunity description
The subject of the Contract is the preparation of Design Documentation and the execution of construction works aimed at constructing the overhead contact line, together with power supply components, autotransformer cabins and control of the KDP overhead contact line switches on the Kotowice – CPK Railway Junction – Łódź section and on the sections connecting to the existing infrastructure/infrastructure being implemented by PKP PLK, together with the reconstruction of the existing PKP PLK infrastructure at the connection points to the extent necessary for execution. Furthermore, the Contractor is required to obtain an EC verification certificate for the Energy subsystem, issue the appropriate declarations of verification and prepare all necessary documentation required to obtain authorisation to place the Energy subsystem in service for an indefinite period. The operating and design speed of the line is 350km/h. The subject of the Contract is the preparation of Design Documentation and the execution of construction works aimed at constructing the overhead contact line, together with power supply components, autotransformer cabins and control of the KDP overhead contact line switches on the Kotowice – CPK Railway Junction – Łódź section and on the sections connecting to the existing infrastructure/infrastructure being implemented by PKP PLK, together with the reconstruction of the existing PKP PLK infrastructure at the connection points to the extent necessary for execution. Furthermore, the Contractor is required to obtain an EC verification certificate for the Energy subsystem, issue the appropriate declarations of verification and prepare all necessary documentation required to obtain authorisation to place the Energy subsystem in service for an indefinite period. The operating and design speed of the line is 350km/h. The detailed subject matter of the contract has been described in the Description of Needs and Requirements (OPW). Procedure: comp-dial. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.