Poland – Construction work – Preparation of design documentation and construction of the 110/15 kV substation named GPZ Siedlec, together with HV and MV connections, (S-2022-04279)
The subject of the contract is the design and construction of: - a 110/15 kV electrical substation named Siedlec, in the H5 configuration, equipped with two 25 MVA transformers, - a 110 kV supply line, - 15 kV cable connections, - modernizat
Opportunity description
The subject of the contract is the design and construction of: - a 110/15 kV electrical substation named Siedlec, in the H5 configuration, equipped with two 25 MVA transformers, - a 110 kV supply line, - 15 kV cable connections, - modernization of the 110 kV line bay, Babimost direction, at GPZ Wolsztyn, - modernization of the 110 kV line bay, Wolsztyn direction, at GPZ Babimost. The scope of the contract includes the performance of all work necessary for the proper functioning of the electrical substation, in accordance with applicable laws and Standards. All necessary design studies must be prepared; the necessary opinions and technical conditions, all arrangements, permits, authorizations, decisions and consents required to perform the Contract in accordance with the Contracting Authority's Requirements and the Conditions of Contract must be obtained in the name and on behalf of the Contracting Authority; the construction work must be carried out; and occupancy permit decisions for the entire scope of the investment must be obtained in the name and on behalf of the Contracting Authority. The subject of the contract is the design and construction of: - a 110/15 kV electrical substation named Siedlec, in the H5 configuration, equipped with two 25 MVA transformers, - a 110 kV supply line, - 15 kV cable connections, - modernization of the 110 kV line bay, Babimost direction, at GPZ Wolsztyn, - modernization of the 110 kV line bay, Wolsztyn direction, at GPZ Babimost. The scope of the contract includes the performance of all work necessary for the proper functioning of the electrical substation, in accordance with applicable laws and Standards. All necessary design studies must be prepared; the necessary opinions and technical conditions, all arrangements, permits, authorizations, decisions and consents required to perform the Contract in accordance with the Contracting Authority's Requirements and the Conditions of Contract must be obtained in the name and on behalf of the Contracting Authority; the construction work must be carried out; and occupancy permit decisions for the entire scope of the investment must be obtained in the name and on behalf of the Contracting Authority. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.