Poland – Construction work – 12 Turystyczna Street in Gdańsk - Renovation and reconstruction of a multi-family residential building under the project entitled “Comprehensive energy modernization of residential and non-residential buildings under conservation protection, located within the Municipality of the City of Gdańsk - in the years 2024-2027”.
1. The subject of the contract is the renovation and reconstruction (including thermal modernization) of a multi-family residential building together with the reconstruction of the accompanying infrastructure at 12 Turystyczna Street in Gdańsk under the project entitled “Comprehensive mode
Opportunity description
1. The subject of the contract is the renovation and reconstruction (including thermal modernization) of a multi-family residential building together with the reconstruction of the accompanying infrastructure at 12 Turystyczna Street in Gdańsk under the project entitled “Comprehensive energy modernization of residential and non-residential buildings under conservation protection, located within the Municipality of the City of Gdańsk - in the years 2024-2027”. 2. The scope of the works includes: a) Site development: - construction of a retaining wall, - replacement of the existing hardened surface of pedestrian routes and construction of the newly designed surface of the entrance and maneuvering road on the plot, - installation of street furniture in the form of outdoor lighting fixtures and benches; - construction of a solid precipitation collection area, - construction of small-scale retention facilities with plantings, b) Demolition and dismantling works: - demolition of the sheet-metal garage on the eastern side, - demolition of the wooden extension on the front (northern) façade side of the former grocery store, - demolition of the existing canopy over the basement stairs on the southern façade side, - demolition of the existing retaining wall and relocation thereof, - removal of the existing cold-water, domestic hot-water and circulation systems, central heating system, and sanitary sewer system, - dismantling of electrical and telecommunications installations, c) Construction works: - renovation and reconstruction of the building interior, taking into account a change in the functional layout (separation of office rooms and a food-service unit); - separation of a residential unit adapted for persons with disabilities, with direct access from ground level, - excavation of the foundation walls down to the level of the lower edge of the strip footing, - installation of thermal insulation for the foundations and foundation walls, - installation of thermal insulation on the basement walls from the inside (2 walls) and from the outside, - installation of thermal insulation on the external walls (from the inside) using mineral boards, - installation of thermal insulation on the ceiling and the floor on the ground, - construction of a new canopy over the external stairs in a wooden structure, - restoration of bricked-up window openings on the ground floor and first floor on the northern, southern and eastern façades, - creation of new window openings in the residential unit on the ground-floor level on the western and southern sides, - infilling of solid-brick walls, - widening of window openings on the first-floor level on the northern façade, - renovation of the building façade with reconstruction of the external partitions—adapting them to the applicable thermal requirements; - removal of all external plaster, - stitching and repair of cracks in the external walls, - installation of vertical and horizontal damp-proofing of the building foundations, - construction of a gravel strip around the building to protect the wall against dampness, - construction of a multi-layer floor on the ground, - replacement of external windows and doors (including the installation of air inlets in all rooms), - replacement of internal doors, - replacement of gutters and downpipes, - replacement of sheet-metal flashings, - installation of internal window sills made of MDF board and external window sills made of titanium-zinc sheet metal, - construction of a technical room for the main water meter on the basement level, - replacement of the pugging in the inter-storey ceiling with mineral wool, - replacement of the existing roof structure, - conservation of degraded structural timber surfaces, - replacement of the roof covering, - partial replacement of the wooden structure of the inter-storey ceilings, - replacement of wooden stair treads, - renovation of the stairs leading to the basement, - renovation of the stairwell; restoration, repair and reconstruction of stairwell elements, - restoration of the internal wooden balustrade, - renovation and reconstruction of the building interior, taking into account a change in the functional layout (separation of office rooms and a food-service unit), - construction of newly designed plasterboard partition walls on a system frame, - relocation of the sanitary sewer risers into one common riser located in the existing chimney, routed through the unused attic area, - separation of tenant storage compartments in the attic, - installation of suspended ceilings in residential rooms, - enclosure of visible installation ducts with gypsum plasterboards on a system frame, - plastering and painting of walls, - application of gypsum plaster and painting of ceilings, - installation of ceramic tiles, stoneware tiles and floor panels, d) Sanitary installations: - construction of an external stormwater drainage system together with a connection, - construction of a new cold-water, domestic hot-water and circulation system, - construction of a new central heating system, sanitary sewer system and gas system, - construction and installation of a dual-function condensing gas boiler, - construction of a hybrid ventilation system, - installation of sanitary fixtures, e) Electrical installations: - supply and installation of the building's main, metering and residential switchboards, - construction of main internal power supply lines and cable routes for the main internal power supply lines, - construction of grounding, lightning-protection, surge-protection and equipotential-bonding installations in the building, - construction of low-current and telecommunications installations, - supply and installation of autonomous smoke detectors, - supply and installation of a certified fire-protection power switch, - construction of basic, emergency and evacuation lighting, - construction of an external lighting installation, - construction of a heating-cable installation and external telecommunications ducting, - construction of structured cabling, internet, terrestrial television and cable television installations, - construction of an intercom system, BMS - commissioning of the individual electrical and telecommunications installations, - performance of as-built measurements of the electrical and telecommunications installations, 3. Details are described in point 3, DESCRIPTION OF THE SUBJECT OF THE CONTRACT, of the Contract Terms Specification. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.