Poland – Construction work – Execution of construction works consisting of the renovation of the staircase in the building at 3 Utrata Street in Suwałki, owned by the Municipality of the City of Suwałki.
1. The subject of the contract is the execution of construction works consisting of the renovation of the staircase in the building at 3 Utrata Street in Suwałki, owned by the Municipality of the City of Suwałki. 2. The detailed scope of the Contractor's obligations is specif
Opportunity description
1. The subject of the contract is the execution of construction works consisting of the renovation of the staircase in the building at 3 Utrata Street in Suwałki, owned by the Municipality of the City of Suwałki. 2. The detailed scope of the Contractor's obligations is specified in the draft agreement constituting Appendix No. 7 to the SWZ. 3. A detailed description of the subject of the contract is contained in Appendix No. 2 to the SWZ – Description of the Subject of the Contract (OPZ). Additionally, the Contracting Authority provides bills of quantities as an auxiliary document. 4. The bills of quantities constitute solely an auxiliary and informational document that the Contractor may use when preparing the tender; however, they do not constitute the basis for determining the full scope of the works. 5. All works must be carried out in accordance with the OPZ and the applicable technical conditions and regulations. 6. Required quality guarantee and statutory warranty period calculated from the date of the final acceptance of the works documented by protocol: minimum 48 months, maximum 60 months. 7. Pursuant to Article 101(4) of the Act, wherever the subject of the contract is described by means of standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority permits solutions equivalent to those described. Furthermore, it shall be assumed that all such references are accompanied by the words "or equivalent". The Contractor is responsible for demonstrating the equivalence of the offered solution pursuant to Article 101(5) of the Act and under the rules specified therein. Where the description is made by means of standards, equivalent solutions shall be understood as solutions that ensure the foaming of the minimum requirements specified in the standard at a level no worse than described in the relevant standards. In the case of standards referenced in the SWZ (unless specified in detail), current standards shall be understood. In other cases (description of the subject of the contract by means of technical assessments, technical specifications and technical reference systems), an equivalent product, material or system shall be one whose technical, functional and quality parameters are no worse than those listed in the description of the subject of the contract. 8. If the description of the subject of the contract includes a provision resulting from KNR or KNNR indicating the necessity of using specific equipment with specific parameters in the performance of the contract, the Contracting Authority permits the use of other equipment, provided that this ensures the achievement of the assumed design parameters and does not create a risk that the completed works will be inconsistent with the technical documentation. 9. Whenever the subject of the contract in this SWZ has been defined by indicating trademarks, patents, origin, etc., the Contracting Authority's intention was to present the "type" of goods meeting the Contracting Authority's requirements. Furthermore, it shall be assumed that all such indications are accompanied by the words "or equivalent". Accordingly, the Contractor may offer an equivalent solution that guarantees parameters, technical and quality standards, and functional standards no worse than those indicated in the SWZ. A Contractor relying on solutions equivalent to those described by the Contracting Authority is required to indicate in the submitted tender that the supplies it offers meet the requirements specified by the Contracting Authority. 10. Pursuant to Article 246(2) of the Public Procurement Law Act, the quality requirements relating to the main elements comprising the subject of the contract have been specified in the Description of the Subject of the Contract and the proposed provisions of the agreement. 11. The works must be carried out in a manner ensuring the uninterrupted functioning of the building and the residential premises located therein. The area where the works are carried out must be appropriately secured against access by unauthorized persons. The Contractor is required to coordinate on an ongoing basis with the Contracting Authority the organization and schedule of the works insofar as they affect the functioning of the building and to carry out the works in a manner that minimizes inconvenience to the building's users. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.