Poland – Construction work – Design (in the srk discipline) and comprehensive execution of construction works on railway line No. 622 on section G Gdów – Szczyrzyc as part of the Project entitled “Construction of the new Podłęże – Szczyrzyc – Tymbark / Mszana Dolna railway line and modernization of the existing railway line No. 104 Chabówka – Nowy Sącz – Stage II”
1. The subject matter of the Contract is the execution of the following elements: The subject matter of the Contract is the execution of the following elements: Design and execution of works for the task entitled “Construction of a structure entitled: railway line No. 622 Gdów –
Opportunity description
1. The subject matter of the Contract is the execution of the following elements: The subject matter of the Contract is the execution of the following elements: Design and execution of works for the task entitled “Construction of a structure entitled: railway line No. 622 Gdów – Szczyrzyc on section G from km 17+487 to km 32+854, together with technical infrastructure along railway line No. 622 on the section from km 17+036 to km 32+973, and railway line No. 623 Fornale junction – Szczyrzyc on section G from km 9+668 to km 10+105, together with technical infrastructure along railway connecting line No. 623 on the section from km 9+668 to km 10+105”. The entire subject matter of the Contract includes the execution of the following elements: 1) Design documentation, including: a) preparation of the detailed design, b) preparation of as-built documentation, including geodetic as-built documentation, 2) and works within the scopes described in the OPZ and PFU: a) track superstructure and subgrade, b) drainage and hydrotechnical works, c) external networks, d) roads, e) railway traffic control (srk) equipment, f) telecommunications equipment and systems, g) overhead contact line and the power supply and control system, h) non-traction power line (LPN); i) electrical power equipment and systems up to 1 kV, j) engineering structures together with accompanying works, including railway tunnels, k) platforms, passenger service facilities and buildings, l) crossings and level crossings, m) geological and geotechnical works, n) works related to the construction of small architectural elements, o) removal of trees and shrubs and environmental works, p) all other works necessary for the performance of the task in accordance with the applicable regulations. 3) works involving the construction of environmental protection structures. 4) conducting the conformity assessment process for structural subsystems within the scope covered by the contract at every stage (design, construction and final subsystem testing) and submitting the relevant EC declarations of verification and EC certificates of verification for the subsystems. The Interface Option includes cooperation with other contractors performing construction works or deliveries for the Contracting Authority that require connection to the railway traffic control equipment installed as part of this task. Cooperation will take place through the Contracting Authority and/or the Engineer. The Contracting Authority anticipates that the scope of works carried out under other Contracts will necessitate, inter alia, changes to the interfaces (i.e. implementation of the Interface Option as part of this task). The detailed scope of the Interface Option is specified in Chapter No. 5 of VOLUME IV — PFU entitled: “Anticipated changes to interfaces”, which concern the srk equipment planned for installation under this contract. 2. The detailed Description of the Subject Matter of the Contract is presented in the Description of the Subject Matter of the Contract constituting Volume III of this SWZ and in the Functional and Utility Program (PFU) constituting Volume IV of this SWZ. 3. The Contracting Authority anticipates awarding contracts referred to in Article 388 point 2) letter c) of the Act. The scope of the contracts referred to in Article 388 point 2) letter c) of the Act and the conditions under which they will be awarded are specified in the OPZ and PFU. A similar contract may be awarded under a single-source procurement procedure following prior negotiations with the Contractor, in particular regarding the terms of the contract, including the price, completion deadline, guarantee period/statutory warranty period, and will consist of the repetition of similar detailed designs in the srk discipline and comprehensive construction works consistent with the subject matter of the contract, particularly in the following scopes: a) dismantling and removal of railway infrastructure in poor technical condition, dilapidated and unused buildings, as well as elements conflicting with the design solutions, b) execution of construction works covering the track discipline with drainage, the engineering structures discipline (including tunnels), together with the execution of hydrotechnical works in their vicinity, the road discipline, the electrical power discipline, the overhead contact line discipline, the overhead contact line power supply discipline, the telecommunications discipline, passenger service facilities and buildings together with surface drainage of the site, the sanitary discipline, and the srk discipline, c) removal of conflicts with networks belonging to various utility operators. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.