Poland – Engineering design services for the construction of civil engineering works – Preparation of design documentation together with the provision of author's supervision for the investment task entitled: “Reconstruction of a section of railway line No. 285 involving raising the track onto an engineering structure over Bardzka Street in Wrocław” as part of the project entitled: “Preparatory Projects”
1. The subject of the Contract is the Preparation of design documentation together with the provision of author's supervision for the investment task entitled: “Reconstruction of a section of railway line No. 285 involving raising the track onto an engineering structure over Bardzka Street in Wrocław” as part of the project entitled: “Preparatory Projects”,
Opportunity description
1. The subject of the Contract is the Preparation of design documentation together with the provision of author's supervision for the investment task entitled: “Reconstruction of a section of railway line No. 285 involving raising the track onto an engineering structure over Bardzka Street in Wrocław” as part of the project entitled: “Preparatory Projects”, including: 1) Phase I – Preparation of design documentation together with obtaining a complete set of administrative decisions, comprising: 1) Preparation of the Programme and Spatial Concept (KPP); 2) Obtaining a final decision on environmental conditions; 3) Obtaining a final decision determining the location of the railway line; 4) Obtaining a final water-law permit; 5) Preparation of construction and detailed designs with geotechnical and geological-engineering documentation, together with obtaining a Building Permit; 6) Preparation of tender materials, i.e.: OPZ, Bill of quantities / RCO, Investor's Cost Estimate, STWiORB, PFU for the Railway Automation and Telecommunications and IT Installation disciplines; 7) Obtaining certification at the design stage 2) Phase II – Option Right comprising the provision of author's supervision for the duration of the construction works. 2. Contract performance period – within 49 months from conclusion of the Contract (if the Option Right is not exercised). The maximum anticipated Contract performance period is 70 months from conclusion of the Contract (if the Option Right is exercised). Whereby: 1) Phase I – will be completed within 49 months from the date of conclusion of the Contract, 2) Phase II – from the day following the date on which the Contracting Authority concludes a contract with the contractor for the construction works contract until the (last) final acceptance of the construction works; the duration of this phase is set at 21 months (Option Right) 3) between Phase I and Phase II, a tender procedure will take place, with an anticipated duration of 6 months. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.