Poland – Engineering design services for the construction of civil engineering works – Preparation of design documentation for a small mountain water retention project of the State Forests National Forest Holding, Węgierska Górka Forest District, under the project entitled: “Comprehensive project for the adaptation of forests and forestry to climate change – small water retention and prevention of water erosion in mountainous areas – continuation (MRG3)
The subject matter of the contract is the preparation of complete design and cost-estimate documentation for a small mountain water retention project located within the Węgierska Górka Forest District, with the scope and level of detail necessary to pr
Opportunity description
The subject matter of the contract is the preparation of complete design and cost-estimate documentation for a small mountain water retention project located within the Węgierska Górka Forest District, with the scope and level of detail necessary to conduct a public procurement procedure for construction works in accordance with the Public Procurement Law, together with all expert assessments, studies, arrangements, opinions and decisions necessary to obtain a final building permit, as well as notifications or decisions necessary to commence construction works (hereinafter referred to as: design documentation), together with the transfer of economic copyrights to the completed documentation, and the provision of author's supervision Preparation of design documentation for the project: Construction of stone fords on forest roads and skid trails in the Kamesznica and Ostre forest districts, together with obtaining all permits and approvals and providing author's supervision until completion of the construction works Preparation of design documentation for the Reconstruction of a wooden cascade into a rapid in the Łukaszne forest district and anti-erosion development of a skid trail in the Żabnica forest district, together with obtaining all permits and approvals and providing author's supervision until completion of the construction works Preparation of design documentation for the project Development of a disused skid trail in the Skrzyczne forest district, Development of a disused skid trail to Barania in the Sikorczane I forest district, and Development of a disused skid trail from the Hunting Lodge in the Sikorczane II forest district, together with obtaining all permits and approvals and providing author's supervision until completion of the construction works Preparation of design documentation for the project Removal of two dams in the Sikorczane Forest District together with the construction of a rapid and a ford, together with obtaining all permits and approvals and providing author's supervision until completion of the construction works Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.