Poland – Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery – MODERNIZATION OF THE 7.4 MW BIOMASS INSTALLATION – CONSTRUCTION/DELIVERY AND INSTALLATION OF A WATER–FLUE GAS ECONOMIZER IN THE MILENIUM BOILER PLANT COMPLEX IN NOWY SĄCZ
MODERNIZATION OF THE 7.4 MW BIOMASS INSTALLATION – CONSTRUCTION/DELIVERY AND INSTALLATION OF A WATER–FLUE GAS ECONOMIZER IN THE MILENIUM BOILER PLANT COMPLEX IN NOWY SĄCZ” The subject of the contract is the design, construction, delivery, installation and commissioning of a condensing economize
Opportunity description
MODERNIZATION OF THE 7.4 MW BIOMASS INSTALLATION – CONSTRUCTION/DELIVERY AND INSTALLATION OF A WATER–FLUE GAS ECONOMIZER IN THE MILENIUM BOILER PLANT COMPLEX IN NOWY SĄCZ” The subject of the contract is the design, construction, delivery, installation and commissioning of a flue gas–water condensing economizer for the existing biomass boiler with a nominal capacity of 7 MW, located on the premises of the Milenium Boiler Plant in Nowy Sącz. “MODERNIZATION OF THE 7.4 MW BIOMASS INSTALLATION – CONSTRUCTION/DELIVERY AND INSTALLATION OF A WATER–FLUE GAS ECONOMIZER IN THE MILENIUM BOILER PLANT COMPLEX IN NOWY SĄCZ” The subject of the contract is the design, construction, delivery, installation and commissioning of a flue gas–water condensing economizer for the existing biomass boiler with a nominal capacity of 7 MW, located on the premises of the Milenium Boiler Plant in Nowy Sącz. A detailed description of the subject of the contract is contained in the procurement documents. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.