Poland – Overhaul and refurbishment work – Renovation of the façade including cleaning, local repairs and repainting of the external walls, as well as renovation of the balconies in the building at 10 Franciszkańska Street in Suwałki
1. The subject of the contract is the renovation of the façade, including cleaning, local repairs and repainting of the external walls, as well as renovation of the balconies in the building at 10 Franciszkańska Street in Suwałki. 2. The detailed scope of the Contractor’s obligations wy
Opportunity description
1. The subject of the contract is the renovation of the façade, including cleaning, local repairs and repainting of the external walls, as well as renovation of the balconies in the building at 10 Franciszkańska Street in Suwałki. 2. The detailed scope of the Contractor’s obligations is specified in the draft contract constituting Appendix No. 7 to the SWZ. 3. A detailed description of the subject of the contract is contained in Appendix No. 2 to the SWZ – Description of the Subject of the Contract (OPZ). In addition, the Contracting Authority provides bills of quantities as an auxiliary document. 4. The bills of quantities constitute solely an auxiliary and informational document that the Contractor may use when preparing the tender; however, they do not constitute the basis for determining the full scope of the works. 5. All works must be carried out in accordance with the OPZ and the applicable technical conditions and regulations. 6. Required quality guarantee and statutory warranty period, calculated from the date of the final acceptance of the works recorded in a protocol: minimum 60 months, maximum 72 months. 7. Pursuant to Article 101(4) of the Act, wherever the subject of the contract is described by means of standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority permits solutions equivalent to those described. Furthermore, it shall be assumed that all such references are accompanied by the words "or equivalent". The Contractor is responsible for demonstrating the equivalence of the proposed solution in accordance with Article 101(5) of the Act and under the rules specified therein. Where the description uses standards, equivalent solutions are understood as solutions that ensure the foaming of the minimum requirements specified in the standard at a level no worse than that described in the relevant standards. In the case of standards cited in the SWZ (unless specified in detail), current standards are understood. In other cases (description of the subject of the contract by means of technical assessments, technical specifications and technical reference systems), an equivalent product, material or system is one whose technical, functional and quality parameters are no worse than those listed in the description of the subject of the contract. 8. If the description of the subject of the contract includes a provision resulting from KNR or KNNR indicating the need to use specific equipment with specific parameters in the performance of the contract, the Contracting Authority permits the use of other equipment, provided that this ensures achievement of the intended design parameters and does not create a risk that the works performed will be inconsistent with the technical documentation. 9. Whenever in this SWZ the subject of the contract has been defined by indicating trademarks, patents, origin, etc., the intention of the Contracting Authority was to present a "type" of goods meeting the Contracting Authority’s requirements. Furthermore, it shall be assumed that all such indications are accompanied by the words "or equivalent". Accordingly, the Contractor may offer an equivalent solution that guarantees parameters, technical and quality standards, and functional standards no worse than those indicated in the SWZ. A Contractor relying on solutions equivalent to those described by the Contracting Authority is required to indicate in the submitted tender that the supplies it offers meet the requirements specified by the Contracting Authority. 10. Pursuant to Article 246(2) of the Public Procurement Law, the quality requirements relating to the main elements comprising the subject of the contract have been specified in the Description of the Subject of the Contract and the proposed contractual provisions. 11. The Contracting Authority provides for the possibility of cancelling the contract award procedure pursuant to Article 257 of the Act of 11 September 2019 – Public Procurement Law if the public funds that the Contracting Authority intended to allocate to financing all or part of the contract are not awarded to it. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.