Poland – Refuse and waste related services – Collection and further management of waste with code ex19 12 12 generated from the shredding of bulky waste at the Waste Disposal Plant in Siedliska near Ełk for a period of 6 months
1. The subject matter of the contract is the provision of a service involving the collection and further management of waste with code ex19 12 12 - other waste (including mixtures of materials and objects) from the mechanical treatment of waste other than that mentioned in 19 12
Opportunity description
1. The subject matter of the contract is the provision of a service involving the collection and further management of waste with code ex19 12 12 - other waste (including mixtures of materials and objects) from the mechanical treatment of waste other than that mentioned in 19 12 11, generated from the shredding of bulky waste at the Municipal Waste Disposal Plant in Siedliska near Ełk over a period of 6 months: 1) “Collection and further management of waste generated after the mechanical processing of municipal waste”, i.e.: a) Waste with the following code is intended for further management: ex19 12 12 – Other waste (including mixtures of materials and objects) from the mechanical treatment of waste other than that mentioned in 19 12 11, which is generated after the shredding of bulky waste and has the following parameters: 8.98 MJ/kg d.m. < heat of combustion < 18.9 MJ/kg d.m., b) Estimated quantity of 600 Mg under the basic contract and possible extension of the contract by: 120 Mg under the 20% option right. 2. Waste collection 1) Waste will be collected from the premises of the Municipal Waste Processing Installation (the so-called Municipal Installation) operated by Przedsiębiorstwo Gospodarki Odpadami “Eko-MAZURY” Sp. z o.o., Siedliska 77, 19-300 Ełk, Warmian-Masurian Voivodeship, Ełk County, Ełk Municipality. The Contractor shall provide vehicles adapted for the collection of municipal waste. 2) Collection shall be carried out using transport organized by the Contractor and at its expense, including the costs of carriage, insurance for the duration of transport, and unloading, in accordance with the Regulation of the Minister of the Environment of 7 October 2016 on detailed requirements for the transport of waste (Journal of Laws of 2016, item 1742). 3) Loading the waste onto the vehicles provided by the Contractor shall be the responsibility of the Contracting Authority. 4) The collected waste shall be weighed on a certified vehicle scale located on the premises of the Municipal Installation. To determine the weight of the collected waste, the Contractor’s vehicle must be weighed before and after loading. 5) Each weighing of the collected waste, confirmed by a weighing receipt, shall be used for settlement purposes. 6) The measuring range of the scale located on the premises of the Municipal Installation is 60 Mg, the platform length is 18.75 m, and the platform width is 3 m. 7) The Contractor shall bear sole liability for any damage, as well as for the loss, shortages, and damage to the waste arising during the transport of the waste from the moment it is released from the Municipal Installation and during transport and unloading of the waste until it has undergone and completed the recovery processes. 8) In particular, the Contractor shall be liable for the acts and omissions of its personnel and of the entities it has engaged to perform the subject matter of the contract, e.g. carriers. 9) Upon release of the waste to the Contractor (to the Carrier designated by it), all benefits and burdens associated with it, as well as the risk of its accidental loss or damage, shall pass to the Contractor; in particular, the Contractor shall assume responsibility for the released waste, for its proper handling, and for the resulting consequences. 10) The Contracting Authority may require the Contractor to present documents confirming performance of the service involving subjecting the waste to a recovery process. 11) Waste collection shall be carried out according to the Contracting Authority’s needs, with 0 to 2 trips per day, from Monday to Friday, excluding public holidays, between 7:00 and 16:00. The Contracting Authority shall inform the Contractor each time of the requirement for a given number of trips. With the consent of the parties to the contract, the number of trips in a single day may exceed 2. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.