Poland – Supervision of building work – Investor supervision services for tasks involving the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Jeleśnia Forest District.
The subject matter of the contract includes: 1. under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms
Opportunity description
The subject matter of the contract includes: 1. under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Jeleśnia Forest District. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2. preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Jeleśnia Forest District. The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Koszarawa Cicha Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Koszarawa Cicha Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.1. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Koszarawa Bystra Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of pipe culverts, small bridges and ford crossings into culverts with natural bottoms in the Koszarawa Bystra Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.2. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of a pipe culvert into a culvert with a natural bottom and the reconstruction of a wooden small bridge into a culvert with a natural bottom and a larger clear opening in the Korbielów Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of the reconstruction of a pipe culvert into a culvert with a natural bottom and the reconstruction of a wooden small bridge into a culvert with a natural bottom and a larger clear opening in the Korbielów Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.3. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Sopotnia Dolna Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Sopotnia Dolna Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.4. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Sopotnia Górna Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Sopotnia Górna Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.5. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of a pipe culvert into a culvert with a natural bottom in the Sopotnia Potok Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of a pipe culvert into a culvert with a natural bottom in the Sopotnia Potok Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.6. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Romanka Górna Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of 3 pipe culverts into culverts with natural bottoms in the Romanka Górna Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.7. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of a pipe culvert into a culvert with a natural bottom in the Czernichów Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of a pipe culvert into a culvert with a natural bottom in the Czernichów Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.8. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of a wooden small bridge into a culvert with a natural bottom in the Kiełbasów Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of a wooden small bridge into a culvert with a natural bottom in the Kiełbasów Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.9. to the SWZ, The subject matter of the contract includes: 1) under the basic contract (hereinafter: the “Basic Contract”), the provision of investor supervision over tasks involving the reconstruction of 3 ford crossings into culverts with natural bottoms in the Ślemień Forest Range. A detailed description is provided in Annex No. 1 to the SWZ – Description of the subject matter of the contract. As part of the performance of the contract, the Contractor will be required to perform the full scope of activities specified in the provisions of the Act of 7 July 1994 – Construction Law and in the implementing regulations for the construction supervision inspector, in accordance with applicable standards, the principles of proper construction practice and professional ethics, as described in detail in Annex No. 1 to the SWZ – Description of the subject matter of the contract. 2) preparation of a verification report (verification and checking of the correctness and completeness of the design documentation before the next stage of project implementation) for the prepared design and cost-estimate documentation concerning the reconstruction of 3 ford crossings into culverts with natural bottoms in the Ślemień Forest Range. The description of the subject matter of the contract, the conditions for its performance and the Contractor’s obligations are contained in: 1) the Description of the Subject Matter of the Contract constituting Annex No. 1 to the SWZ. 2) the draft contract constituting Annex No. 2.10. to the SWZ, Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.