Romania – Construction supervision services – Supervision Services “Modernization of DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes”
The subject of the contract, Supervision Services „ Modernization of DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km
Opportunity description
The subject of the contract, Supervision Services „ Modernization of DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes, will consist of the provision of high-quality supervision services, both during the design and execution period of the works and throughout the warranty period of the works, with a view to monitoring the proper use of the available funds and ensuring that the Contractor designs and executes the works in accordance with the contractual obligations, particularly with regard to the duration, quantity, quality and cost of the design and works. In accordance with the provisions of Art. 160 para. (1) of Law No. 98/2016, as subsequently amended and supplemented, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information concerning the procurement documentation is 18 days before the deadline for submitting tenders. In accordance with the provisions of Art. 160 para. (2) of Law 98/2016, as subsequently amended and supplemented, the Contracting Authority establishes a single deadline by which it will respond to all requests for clarification/additional information, as follows: 11 days before the deadline for submitting tenders. The deadline for responding to clarifications was established so that economic operators have an adequate period to analyze the procurement documentation and subsequently prepare their tenders in light of the responses provided by the Contracting Authority. In accordance with the provisions of Art. 104 para. (8) of Law No. 98/2016, the Contracting Authority opts for the subsequent procurement of new similar services from the tenderer whose tender will be declared the winner under this public procurement procedure, in the amount of 2,347,342.00 lei excluding VAT, the value representing 20% of the estimated contract value (excluding provisional sums and implementation reserves). The Total Estimated Value of the contract (including similar services) is 15,472,723.00 lei excluding VAT. The minimum value of the range in Section II.1.5 represents the estimated value of this procedure, on the basis of which the tender will be prepared and evaluated, while the maximum value of the range in Section II.1.5 represents the estimated value containing both the estimated value of this procedure and the value of possible new similar services pursuant to Art. 104 para. (8) of Law No. 98/2016. The subject of this Service Contract is the provision of high-quality supervision services, both during the design and execution period of the works and throughout the warranty period of the works, with a view to monitoring the proper use of the available funds and ensuring that the Contractor designs and executes the works in accordance with the contractual obligations, particularly with regard to the duration, quantity, quality and cost of the design and works. The Consultant will have the role of Supervisor in accordance with the provisions of the Conditions of Contract „Modernization of DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes. In accordance with the provisions of Art. 221 of Law 98/2016, as subsequently amended and supplemented, and in compliance with Article 24 of the Service Contract, any modifications that may occur during the performance period of the contract concern the following, without being limited thereto: 1. Changes to the contracting parties; 2. Changes resulting from the need to conduct additional studies/expert assessments; 3. Changes resulting from the implementation of requests received from various institutions/authorities/entities that have responsibilities relating to the investment objective (for example: Ministries, JASPERS, Central and/or Local Authorities/Institutions, Certified Verifiers, inspection bodies, etc.); 4. Legislative changes or changes to technical norms/STAS standards/regulations/standards during the performance of the contract; 5. Changes generated by the inclusion/introduction of new subcontractors and/or replacement of the initial subcontractors; 6. Changes generated by changing/replacing key/non-key personnel/other personnel (other than the experts/persons who were scored under the evaluation factors relating to the award criterion); 7. Changes concerning the extension of the deadlines for the Provider’s submission of the reports/deliverables specified in the contract or changes concerning the Beneficiary’s verification and approval of the reports/deliverables 8. Modification of the Gantt Activity Schedule initially included in the Contract during the Service Provision Period in light of the reallocation of personnel and/or existing resources/savings. 9. Reallocation of resources or savings within the service contract arising from: a) non-use of working days due to the non-mobilization/demobilization/reduced mobilization of experts/personnel; b) the likelihood that certain resources will no longer be used/needed; c) application of the provisions of Art. 20.9 of the Service Contract; d) non-use of working days due to the late signing of the service contract relative to the design and execution contract (where certain phases of the design and execution contract have already been completed); e) redistribution of working days among experts/persons and/or among the stages/phases of the service contract in order to correlate the supervision services with the duration/phase/stage/evolution/physical status/physical progress of the works design and execution contract; 10. Extension of the Service Provision Period based on the changes mentioned in the points above, as well as in the following situations: a) extension of the works design period and/or the works execution period and/or the warranty period of the works; b) the need to correlate the service provision period with the duration/phase/stage/evolution/physical status/physical progress of the works design and execution contract; c) delay in the execution of the works or in the design activity as a result of difficulties encountered by the Contractor; d) suspension/termination of the design and execution contract; e) the occurrence of Traffic Police regulations/orders after the signing of the design and execution contract; f) the occurrence of additional works under the design and execution contract identified after the commencement of the works; g) the Contractor’s weak and prolonged mobilization; h) the occurrence of the need to use the amounts relating to implementation reserves; i) the occurrence of the need to reallocate/use resources or savings within the service contract; j) the occurrence of risks concerning the obtaining of approvals/permits/certificates/authorizations (including the Building Permit) that must be obtained from third parties; The modifications will be made after the signing of the contract, in accordance with the contractual provisions, only provided that they do not constitute substantial modifications within the meaning of the provisions of Art. 221 para. (7) of Law No. 98/2016. The extension of the Service Provision Period will be carried out in accordance with the provisions of Article 24 of the Service Contract. More information can be found in the Contract. Procedure: open. Estimated value: 15,472,723 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.