Romania – Construction work for buildings relating to education and research – Works (design and execution) for the implementation of the investment objective “Construction of a building intended as a nursery in the northern area” Timișoara
Under the contract, works (design and execution) will be carried out for the implementation of the investment objective “Construction of a building intended as a nursery in the northern area” Timișoara, in accordance with the requirements of the procurement documentation
Opportunity description
Under the contract, works (design and execution) will be carried out for the implementation of the investment objective “Construction of a building intended as a nursery in the northern area” Timișoara, in accordance with the requirements of the procurement documentation. The contracting authority will respond clearly and completely to all requests for clarification/additional information on the 12th day before the deadline established for the submission of tenders, provided that the requests are submitted at least 22 days before the deadline established for the submission of tenders. Clarifications submitted after this deadline will no longer be taken into consideration. The Municipality of Timişoara wishes to procure works (design and execution) for the implementation of the investment objective “Construction of a building intended as a nursery in the northern area” Timișoara, in accordance with the requirements of the procurement documentation. According to the attached technical assessment, it was concluded that general repair/strengthening interventions on the structural elements already executed are not necessary. However, in view of the shortcomings and deterioration identified, the implementation of the following intervention solutions was recommended: • Local strengthening of the beam located at elevation +4.05, on axis 5 of building B, where a bending capacity deficit was found in two sections located at the supports of the large span; strengthening will be carried out by applying an FRP (fiber-reinforced polymer) system; • Ensuring the quality of the masonry along the perimeter of all enclosure and partition walls by restoring continuity, integrity, and flatness in the problem areas identified in the respective plans; • For the walls on axis 3, the non-compliant masonry uprights will be dismantled and reinforced-concrete/metal columns will be installed in their place. • Reconstruction of the structural masonry walls in the area of the two elevator shafts, in order to ensure their structural integrity and their composite action with confinement elements. • Non-compliant openings made in non-structural walls for the passage of pipes belonging to the ventilation system will be treated. In addition, all categories of works provided for in the initial technical design must be carried out/completed, namely: • thermal insulation/waterproofing/joinery/exterior finishes/interior finishes/equipment • high- and low-current electrical installations • heating and ventilation installations • sanitary installations • indoor/outdoor hydrant installations and works to comply with ISU requirements • external utility-provider networks • execution of fencing and exterior landscaping works in accordance with the technical design. Additionally, the Contractor, acting as designer, will: - provide documentation regarding the operation, maintenance, repair, and monitoring over time of the behavior of the installations and equipment completed/procured as part of the investment - prepare the documentation required for registration of the investment in the land register and will also obtain the Land Registry Extract. - provide the documents required to prepare the project as constructed (as built); - prepare the related documentation to obtain the authorizations/approvals required for commissioning/operation of the property and related installations (Fire Safety, Burglary Security, IGPR, ISCIR, DSP, DSVSA, SSM, etc.) Procedure: open. Estimated value: 6,315,996.62 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.