Romania – Construction work for highways, roads – Design and Construction of the A1 Road Junction (km 326+155) – DJ 704 (Cugir)
The subject of the contract is the design and construction of the Road Junction located on the A1 Motorway (km 326+155) – DJ 704 (Cugir), in accordance with the provisions of the works contract. In accordance with the provisions of Article 160(1) of
Opportunity description
The subject of the contract is the design and construction of the Road Junction located on the A1 Motorway (km 326+155) – DJ 704 (Cugir), in accordance with the provisions of the works contract. In accordance with the provisions of Article 160(1) of Law No. 98/2016, as subsequently amended and supplemented, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information in connection with the procurement documentation is 25 days before the deadline for submission of tenders. In accordance with the provisions of Article 160(2) of Law 98/2016, as subsequently amended and supplemented, the Contracting Authority establishes a single deadline by which it will respond to all requests for clarification/additional information, as follows: 12 days before the deadline for submission of tenders. The deadline for responding to clarifications was established so that economic operators have an adequate period to analyze the procurement documentation and, subsequently, to prepare their tenders in light of the responses provided by the Contracting Authority. The subject of the contract is the design and construction of the Road Junction located on the A1 Motorway (km 326+155) – DJ 704 (Cugir), in accordance with the provisions of the works contract. In accordance with the contractual provisions, namely those of Government Decision No. 1/2018, any amendments that may occur during the performance of the contract concern the following, without being limited thereto: 1. Changes to the contracting parties, including replacement of the contractor with a new contractor under the conditions provided for in Article 221(1)(d), point (ii); 2. Change of the company name and/or legal form, changes that do not result in the creation of a new legal person; 3. Amendments resulting from adapting the Technical Execution Design to actual site conditions, including changes to specific technical solutions; 4. Amendments resulting from changes/adaptations to the levels, positions and/or dimensions of certain works due to site conditions; 5. Amendments arising from requirements of the environmental authorities; 6. Amendments resulting from the need to move/relocate certain objects located on/in the ground/subsoil; 7. Amendments arising from the inclusion of new subcontractors/suppliers/subcontractors of subcontractors/any other economic operators and/or arising from the replacement of the initial subcontractors/suppliers/subcontractors of subcontractors/any other economic operators, which will be made in accordance with the corresponding clause of the General Conditions of Contract; 8. Amendments arising from changes to key personnel/other personnel, which will be made in accordance with the corresponding clause of the General Conditions of Contract; 9. Amendments to the expropriation route/corridor that result in the need to carry out additional works and/or to abandon the execution of certain works included in the Contract; 10. Amendments arising from agreements, conventions or arrangements between the state/local authorities and other states; 11. Legislative amendments or changes to technical rules/STAS standards/regulations/standards during the performance of the contract, which will be implemented in accordance with the corresponding clause of the General Conditions of Contract, in compliance with Article 221 of Law No. 98/2016, as subsequently amended and supplemented; 12. Extension of the Execution Period based on the contractual mechanism provided for in Clause 35 [Extension of the Execution Period] of the General Conditions, without prejudice to the Beneficiary's right to impose on the Contractor the penalties and/or sanctions provided for in the contract; 13. Amendments resulting from the implementation of requests from various institutions/authorities/entities with responsibilities related to the investment objective (for example: Ministries, JASPERS, central and/or local Authorities/Institutions, Certified Verifiers, control bodies, etc.). 14. Amendments resulting from archaeological clearance. 15. Amendments arising from changes to the terrain and to the above-ground and underground hydrographic network that were unknown on the date the Technical Execution Design was prepared; The amendments will be made after the contract is signed, in accordance with the contractual provisions, only provided that they do not constitute substantial amendments within the meaning of Article 221(7) of Law No. 98/2016. The Execution Period will be extended in accordance with Clause 35 [Extension of the Execution Period] of the General Conditions. Further information can be found in the Contract. Procedure: open. Estimated value: 149,112,769.48 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.