Romania – Construction work for water projects – Design and execution of works related to Sub-investment I.4.2.1 Rehabilitation of existing permanent reservoirs under the project "Investment I.4. Adaptation to climate change through the automation and digitalization of water discharge and storage equipment at existing reservoirs to ensure ecological flow and increase the security of the population’s water supply and reduce flood risk"
Through this procurement, design and execution activities will be carried out for works related to Sub-investment I.4.2.1 Rehabilitation of existing permanent reservoirs under the project "Investment I.4. Adaptation to climate change thr
Opportunity description
Through this procurement, design and execution activities will be carried out for works related to Sub-investment I.4.2.1 Rehabilitation of existing permanent reservoirs under the project "Investment I.4. Adaptation to climate change through the automation and digitalization of water discharge and storage equipment at existing reservoirs to ensure ecological flow and increase the security of the population’s water supply and reduce flood risk", financed through the PNRR” - Lots 1-13, CPV Codes – 45240000-1, 45241000-8, 45241100-9, 45247200-2, 45247210-5, 45247212-9, 45247240-4, 45248000-7, 71242000-6, 71322000-1, 71321000-4, 71322400-5, 79930000-2, 71336000-2, in accordance with the requirements and description in the Employer’s Requirements. The procurement is being conducted under the project "Investment I.4. Adaptation to climate change through the automation and digitalization of water discharge and storage equipment at existing reservoirs to ensure ecological flow and increase the security of the population’s water supply and reduce flood risk", financed through the PNRR. The subject of sub-investment I4.2.1 - Rehabilitation of existing permanent reservoirs (dams), which is the subject of this invitation, consists of rehabilitation works for 13 existing dams, as a result of the technical-economic documentation prepared at the DALI stage, where it was concluded that there are no feasible alternatives for reducing flood risks, with the intervention to be carried out in accordance with the requirements provided for at the level of Milestone 16 in the ANNEX to COUNCIL IMPLEMENTING DECISION No. 15833/23 ADD1, concerning the amendment of the Implementing Decision of 29 October 2021 approving the assessment of Romania’s recovery and resilience plan; the investment objectives must be completed in the first quarter of 2026, fully complying with the results and conditions established in the comprehensive and cumulative environmental impact assessment that will be completed in accordance with Directive 2011/92/EU (Environmental Impact Assessment Directive), as well as the relevant assessments in the context of Directive 2000/60/EC (Water Framework Directive) and the appropriate assessment pursuant to Directive 92/43/EEC (Habitats Directive), including implementation of the necessary mitigation measures. Any request for clarification must be submitted in SEAP (https://e-licitatie.ro/pub ). The number of days before the deadline for submission of tenders by which clarifications may be requested is 18 days. The contracting authority will respond clearly and completely to all requests for clarification on the 11th day before the deadline for submission of tenders”. The consolidated response to requests for clarification will be posted in the “list of clarifications, notifications and decisions” section of the contract notice published on the website http: www.e-licitatie.ro. We mention that, in accordance with the provisions of Art. 3 (1), GEO 155/2020, as subsequently amended and supplemented, Art. 23 (7), GEO 124/2021, as subsequently amended and supplemented, ” (7) Beneficiaries may conduct procedures for the award of contracts for the execution of works, technical assistance, site supervision and other categories of contracts necessary for implementing public investment projects, with the inclusion in the related procurement documents of a suspensive condition concerning approval of financing for the project from the PNRR”, the procedure for awarding the public procurement contract will be initiated subject to the suspensive clause, in the sense that the conclusion of the public procurement contract is conditional upon the allocation of budget appropriations for this purpose, with the contract being signed in compliance with the provisions concerning the commitment of expenditure from budgets subject to public-finance legislation. Interested economic operators may access information concerning the DALIs for the 13 lots at: https://rowater.ro/activitatea-institutiei/licitatii/achizitii/. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 1 – Approved OPTION 2 - consist of: - Intervention works on the dam, including restoration of the crest - Construction of the floating-debris collection system - Rehabilitation of the area downstream of the dam - Creation of green floating islands - Equipment to ensure fish migration - Measures to ensure ecological flow - Replacement/modernization of the AMC system - Replacement of the existing mechanical equipment and electrical equipment and installations. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 2 – Approved OPTION 1 - consist of: - Intervention works on the Leșu dam, including rehabilitation of the road on the crest - Rehabilitation of the monitoring system, including a warning and alarm system – SCADA - Rehabilitation of hydromechanical and electrical equipment - Measures to ensure longitudinal connectivity - Measures to ensure ecological flows - Creation of floating islands to improve water quality in the - reservoir - Floating-waste collection systems. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 3 – Approved OPTION 1 - consist of: - Intervention works on intake dams Nos. 1 and 2 - Making the stilling basins at intake dams Nos. 1 and 2 safe - Floating-debris retention system - Rehabilitation/replacement of hydromechanical and electrical equipment - Intervention works on the turbine channel - works to ensure longitudinal connectivity. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 4 – Approved OPTION 1 - consist of: - Intervention works on the dam - Floating-debris retention system - Creation of green floating islands - Measures to ensure ecological flow - Rehabilitation/replacement of hydromechanical and electrical equipment - Works to ensure longitudinal connectivity. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 5 – OPTION 1A - Approved consist of: - Intervention works on the dam - Left-slope monitoring system - Dam monitoring system - Rehabilitation/replacement of hydromechanical and electrical equipment - Floating-debris collection system - Creation of green floating islands - Measures to ensure ecological flow - Works to ensure longitudinal connectivity. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 6 – OPTION 1 - Approved consist of: - Works carried out in the reservoir basin - Works to develop the Doamnei riverbed downstream of the development’s spillway front - Wetland development - Rehabilitation of the hydraulic actuation installation for the segment gates at the bottom outlet, the flap gates at the surface spillway, and their related auxiliary installations. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 7 – OPTION 1A Stage I – Approved, consist of: - Rehabilitation works on the structural elements and hydromechanical equipment of the Lacul Morii dam - Rehabilitation of the development on the right bank of the reservoir - rehabilitation and modernization of the lifting installation for the stoplog elements at the flood spillway and bottom outlet - technological upgrading of the aeration installation for the flap gates at the flood spillway - rehabilitation and modernization of the actuation installation for the slide gates and stoplogs, as well as construction of the power-supply and actuation electrical installation at the Ciurel Intake - Rehabilitation and modernization of measuring and monitoring equipment at the dam - Works to ensure longitudinal connectivity - Floating-debris collection system - Creation of green floating islands - Photovoltaic-panel system. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 8 – OPTION 1A, Variant 2 - Stage I, approved, consist of: - Intervention works on the Budeasa dam - Rehabilitation/replacement of hydromechanical and electrical equipment - Construction of a floating-debris collection system - Creation of forest belts - Creation of green floating islands and the aeration system - Works to ensure longitudinal connectivity - Installation of photovoltaic-panel systems. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 9 OPTION 1A, Stage I – approved, consist of: - Intervention works on the Buftea dam - Rehabilitation/replacement of hydromechanical and electrical equipment - Construction of the dam measurement and control instrumentation system - Construction of a floating-debris collection system - Creation of green floating islands and the aeration system - Works to ensure longitudinal connectivity - Installation of photovoltaic-panel systems. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 10 – SCENARIO II - approved, consist of: - Intervention works on the Valea Oii and Piatra Roșie reservoirs - Rehabilitation of hydromechanical equipment at the Valea Oii and Piatra Roșie reservoirs - Construction of a spillway sill at the discharge of the Bicaz River into Lacul Roșu - Works to ensure longitudinal connectivity. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 11 – OPTION 1A, Approved, consist of: - Intervention works on the Cucuteni dam - Rehabilitation/replacement of hydromechanical and electrical equipment - Construction of a floating-debris collection system - Creation of forest belts - Creation of green floating islands - Works to ensure longitudinal connectivity - Installation of photovoltaic-panel systems. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 12 OPTION 1A, Approved, consist of: - Intervention works on the Căzănești dam - Rehabilitation/replacement of hydromechanical and electrical equipment - Rehabilitation/modernization of equipment for measuring and monitoring seepage through the dam and foundation - Construction of a floating-debris collection system - Creation of shelterbelts - Creation of green floating islands - Works to ensure longitudinal connectivity - Installation of photovoltaic-panel systems. Procurement of design services and execution of rehabilitation works for the existing permanent reservoir, according to the specifications in the Employer’s Requirements. The works provided for in the DALI for Lot 13 OPTION 1A, Approved, consist of: - Intervention works on the Solești dam - Rehabilitation/replacement of hydromechanical and electrical equipment - Rehabilitation/modernization of equipment for measuring and monitoring seepage through the dam and foundation - Construction of a floating-debris collection system - Creation of shelterbelts - Creation of green floating islands - Works to ensure longitudinal connectivity - Installation of photovoltaic-panel systems. Procedure: open. Estimated value: 672,957,313.46 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.