Romania – Electrical installation work – Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots
Under this procurement, DEER SA intends to award a sectoral works procurement contract for each lot, in accordance with the conditions imposed in the attached specifications, as follows: Lot 1 - Works for the installation of smart ele
Opportunity description
Under this procurement, DEER SA intends to award a sectoral works procurement contract for each lot, in accordance with the conditions imposed in the attached specifications, as follows: Lot 1 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Galati Lot 2 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Braila Lot 3 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Focsani Lot 4 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Ploiesti Lot 5 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Targoviste Estimated value excluding VAT 47.929.711,22 lei excluding VAT, of which: Lot 1: 14.846.524,63 lei Lot 2: 10.340.011,99 lei Lot 3: 6.267.496,93 lei Lot 4: 10.944.475,31 lei Lot 5: 5.531.202,36 lei Performance period of each contract: 33 months, but no later than 30.09.2028. Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots - Lot 1 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Galati. The Contracting Entity obtained European funding through the financing program Modernisation Fund 3 MODERNISATION AND CONSTRUCTION OF NEW SECTIONS OF ENERGY INFRASTRUCTURE Investment Measure 3.2. Supporting investments for the expansion and modernisation of the electricity distribution network, to finance the expansion of the smart metering system through the financing projects: - Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște. Works will be carried out to install smart single-phase electricity meters and direct-connected smart three-phase electricity meters in the electrical installations of Distribuție Energie Electrică Romania, in 5 county-seat cities in the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște, for the entire quantity of metering devices specified in the annexes to the specifications. The replacement of conventional electricity meters with smart electricity meters will be carried out under the following categories of works: • Replacement of a single-phase meter with a smart single-phase electronic meter • Replacement of a three-phase meter with a smart three-phase electronic meter • Installation of a concentrator and balance meter at the PTA, including a security and protection enclosure • Installation of a concentrator and balance meter at the PTZ, including a security and protection enclosure • Installation of a signal filter/repeater • Installation of an ethernet converter Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots - Lot 2 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Brăila. The Contracting Entity obtained European funding through the financing program Modernisation Fund 3 MODERNISATION AND CONSTRUCTION OF NEW SECTIONS OF ENERGY INFRASTRUCTURE Investment Measure 3.2. Supporting investments for the expansion and modernisation of the electricity distribution network, to finance the expansion of the smart metering system through the financing projects: - Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște. Works will be carried out to install smart single-phase electricity meters and direct-connected smart three-phase electricity meters in the electrical installations of Distribuție Energie Electrică Romania, in 5 county-seat cities in the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște, for the entire quantity of metering devices specified in the annexes to the specifications. The replacement of conventional electricity meters with smart electricity meters will be carried out under the following categories of works: • Replacement of a single-phase meter with a smart single-phase electronic meter • Replacement of a three-phase meter with a smart three-phase electronic meter • Installation of a concentrator and balance meter at the PTA, including a security and protection enclosure • Installation of a concentrator and balance meter at the PTZ, including a security and protection enclosure • Installation of a signal filter/repeater • Installation of an ethernet converter Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots - Lot 3 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Focsani. The Contracting Entity obtained European funding through the financing program Modernisation Fund 3 MODERNISATION AND CONSTRUCTION OF NEW SECTIONS OF ENERGY INFRASTRUCTURE Investment Measure 3.2. Supporting investments for the expansion and modernisation of the electricity distribution network, to finance the expansion of the smart metering system through the financing projects: - Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște. Works will be carried out to install smart single-phase electricity meters and direct-connected smart three-phase electricity meters in the electrical installations of Distribuție Energie Electrică Romania, in 5 county-seat cities in the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște, for the entire quantity of metering devices specified in the annexes to the specifications. The replacement of conventional electricity meters with smart electricity meters will be carried out under the following categories of works: • Replacement of a single-phase meter with a smart single-phase electronic meter • Replacement of a three-phase meter with a smart three-phase electronic meter • Installation of a concentrator and balance meter at the PTA, including a security and protection enclosure • Installation of a concentrator and balance meter at the PTZ, including a security and protection enclosure • Installation of a signal filter/repeater • Installation of an ethernet converter Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots - Lot 4 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Ploiesti. The Contracting Entity obtained European funding through the financing program Modernisation Fund 3 MODERNISATION AND CONSTRUCTION OF NEW SECTIONS OF ENERGY INFRASTRUCTURE Investment Measure 3.2. Supporting investments for the expansion and modernisation of the electricity distribution network, to finance the expansion of the smart metering system through the financing projects: - Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște. Works will be carried out to install smart single-phase electricity meters and direct-connected smart three-phase electricity meters in the electrical installations of Distribuție Energie Electrică Romania, in 5 county-seat cities in the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște, for the entire quantity of metering devices specified in the annexes to the specifications. The replacement of conventional electricity meters with smart electricity meters will be carried out under the following categories of works: • Replacement of a single-phase meter with a smart single-phase electronic meter • Replacement of a three-phase meter with a smart three-phase electronic meter • Installation of a concentrator and balance meter at the PTA, including a security and protection enclosure • Installation of a concentrator and balance meter at the PTZ, including a security and protection enclosure • Installation of a signal filter/repeater • Installation of an ethernet converter Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Works to replace existing conventional meters with smart meters for “Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galati, Braila, Focsani, Ploiesti and Targoviste – 5 lots - Lot 5 - Works for the installation of smart electricity meters, with related materials included, in the Municipality of Targoviste. The Contracting Entity obtained European funding through the financing program Modernisation Fund 3 MODERNISATION AND CONSTRUCTION OF NEW SECTIONS OF ENERGY INFRASTRUCTURE Investment Measure 3.2. Supporting investments for the expansion and modernisation of the electricity distribution network, to finance the expansion of the smart metering system through the financing projects: - Implementation of the smart electricity metering system in the county-seat cities of the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște. Works will be carried out to install smart single-phase electricity meters and direct-connected smart three-phase electricity meters in the electrical installations of Distribuție Energie Electrică Romania, in 5 county-seat cities in the North Muntenia area: Galați, Braila, Focșani, Ploiești and Târgoviște, for the entire quantity of metering devices specified in the annexes to the specifications. The replacement of conventional electricity meters with smart electricity meters will be carried out under the following categories of works: • Replacement of a single-phase meter with a smart single-phase electronic meter • Replacement of a three-phase meter with a smart three-phase electronic meter • Installation of a concentrator and balance meter at the PTA, including a security and protection enclosure • Installation of a concentrator and balance meter at the PTZ, including a security and protection enclosure • Installation of a signal filter/repeater • Installation of an ethernet converter Note: The number of days before the deadline for submission of tenders by which potential tenderers may request clarifications regarding the procurement documentation is 20. The contracting entity will respond to all requests for clarifications or additional information 10 days before the deadline established for the submission of tenders. Procedure: open. Estimated value: 47,929,711.22 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.