Romania – Highway maintenance work – “Framework agreement – Periodic maintenance works – Asphalt overlays, Year I–Year IV – Lot 1-SDN Craiova, Lot 2-SDN Dr. Tr. Severin, Lot 3-SDN Tg. Jiu, Lot 4-SDN Rm. Valcea, Lot 5-SDN Slatina, Lot 6-SDN Orsova”
Execution of periodic maintenance works – Asphalt overlays, Year I–Year IV – Lot 1-SDN Craiova, Lot 2-SDN Dr. Tr. Severin, Lot 3-SDN Tg. Jiu, Lot 4-SDN Rm. Valcea, Lot 5-SDN Slatina, Lot 6-SDN Orsova. The contractor will be responsible for execu
Opportunity description
Execution of periodic maintenance works – Asphalt overlays, Year I–Year IV – Lot 1-SDN Craiova, Lot 2-SDN Dr. Tr. Severin, Lot 3-SDN Tg. Jiu, Lot 4-SDN Rm. Valcea, Lot 5-SDN Slatina, Lot 6-SDN Orsova. The contractor will be responsible for laying asphalt overlays, applying road markings and completing shoulders on the sections where asphalt overlays have been laid. Clarifications: 1. The warranty for the works is 36 months (including markings) from the conclusion of the works completion acceptance report, a report signed without objections. 2. Obtaining a building permit is not necessary. Note: A) Pursuant to Article 160(1) of Law 98/2016, as amended and supplemented, the deadline by which economic operators interested in participating in the public procurement procedure have the right to request clarifications concerning the procurement documentation is 20 days before the deadline for submission of tenders. B) In accordance with the obligation provided for in Article 160(2) of Law 98/2016, as amended and supplemented, the contracting authority will respond clearly and specifically to all requests for clarification on the 11th day before the deadline established for submission of tenders. Any request for clarification submitted after the date mentioned in point A) will make it impossible for the contracting authority to provide a response within the period mentioned in point B), and consequently any request for clarification outside the stated time limits will be considered late. C) Both the economic operators’ requests for clarification concerning the procurement documentation and the contracting authority’s response to requests for clarification or additional information received under the conditions of Article 160(1) of the Law shall be posted in SEAP in the specific section available in the information system. Proposed works: • For the SDN Craiova lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type asphalt concrete and MAS16 with correction of unevenness: a) Overlay with MAS16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 6 km 233+000 – 238+350 technical class 1; 238+350 – 253+000 technical class 2; 253+000 – 265+000 technical class 2; 265+000 – 268+389 technical class 3; - DN 65 km 3+866 – 7+650 technical class 1; 7+650 – 9+200 technical class 2; 14+333 – 21+250 technical class 2; Except for bridges and intersections with paved side roads. b) Overlay with MAS16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: Applies to: - all bridge surfaces and 10 m at the ends of the approaches on DN 54A km 29+000 – 44+174, DN 6 km 233+000 – 268+389, DN 65 km 3+866 – 9+200 / 14+333 – 21+250, DN 56A km 0+000 – 17+120 and DN 6B km 2+850 – 33+210; - all intersection areas of DN 6 km 233+000 – 265+000, DN 65 km 3+866 – 9+200 / 14+333 – 21+250 with paved side roads; - sections with a street profile (carriageway bordered by uneven curbs) under point a). 2. Asphalt overlay with BA16-type stabilized asphalt mixture and BA16 with correction of unevenness: a) Overlay with BA16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; - DN 54A km 29+000 – 44+174 technical class 4; - DN 56A km 0+000 – 17+120 technical class 3; - DN 6B km 2+850 – 33+210 technical class 3. b) Overlay with BA16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: Applies to: - all intersection areas of DN 54A km 29+000 – 44+174, DN 56A km 0+000 – 17+120, DN 6B km 2+850 – 33+210 with paved side roads; - sections with a street profile (carriageway bordered by uneven curbs) under point a). The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Proposed works: • For the SDN Severin lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type stabilized asphalt mixture: a) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 6 km 298+000 – 313+000 technical class 2; - DN 6 km 313+000 – 328+000 technical class 2; - DN 56A km 69+422 – 79+147 technical class 2. Except for bridges and intersections with paved side roads. b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches; - all intersection areas with paved side roads. - areas with a street profile. 2. BA16-type stabilized asphalt mixture and BA16 with correction of unevenness: a) Overlay with BA16-type asphalt concrete, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 56A km 17+120-40+700 technical class 3; 40+700 – 69+422 technical class 3; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches. The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Proposed works: • For the SDN Tg. Jiu lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type stabilized asphalt mixture and MAS16 with correction of unevenness: a) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 67 km 60+550 - 63+260 technical class 2; 85+795 – 99+400 technical class 2; Except for bridges and intersections with paved side roads. b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: Applies to: - all bridge surfaces and 10 m at the ends of the approaches; - all intersection areas with paved side roads. - areas with a street profile. 2. Asphalt overlay with BA16-type asphalt concrete and BA16 with correction of unevenness: a) Overlay with BA16-type asphalt concrete, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 67 km 39+150 – 52+850 technical class 3; 54+050 – 60+550 technical class 3; 99+400-114+620 technical class 3; 114+620-129+000 technical class 3; 133+000-135+500 technical class 3; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches. The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Proposed works: • For the SDN Rm. Valcea lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type stabilized asphalt mixture and MAS16 with correction of unevenness: a) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 7 km 159+759-174+870 technical class 1; 180+780-182+780 technical class 1; 208+000-214+000 technical class 2; 236+000-238+197 technical class 2; - DN 67 km 136+720 – 152+700 technical class 1; 178+770 – 198+769 technical class 2; Except for bridges and intersections with paved side roads. b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches; - all intersection areas with paved side roads. - areas with a street profile. 2. BA16-type stabilized asphalt mixture and BA16 with correction of unevenness: a) Overlay with BA16-type asphalt concrete, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 7A km 0+000-22+000 technical class 4; 40+000-63+000 technical class 4; - DN 64 km 66+605-92+434 technical class 3; 101+400-105+960 technical class 3; 120+474-135+434 technical class 3; - DN 67 km 135+500 – 136+720 technical class 3; 152+700 – 165+500 technical class 3; 165+500 – 178+770 technical class 3; - DN 7CC km 0+000-1+637 technical class 3; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches. The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Proposed works: • For the SDN Slatina lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type stabilized asphalt mixture and MAS16 with correction of unevenness: a) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 65 km 71+000 - 90+050 technical class 2; 21+250 - 33+000 technical class 2; 43+000 - 49+000 technical class 2; 63+500 - 71+000 technical class 2; Except for bridges and intersections with paved side roads. b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches; - all intersection areas with paved side roads. - areas with a street profile. 2. BA16-type asphalt concrete and BA16 with correction of unevenness: a) Overlay with BA16-type asphalt concrete, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 54A km 16+000 - 29+000 technical class 4; - DN 64 km 2+000 - 34+000 technical class 3; - DN 54 km 27+620 - 54+500 technical class 4; 1+550 – 21+510 technical class 3; 21+510 - 23+600 technical class 4; - DN 67B km 117+350 - 120+365 technical class 4; 1 20+365 -158+200 technical class 4; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches. The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Proposed works: • For the SDN Orsova lot, DRDP Craiova selected 2 types of asphalt overlays to be laid during Year I–Year IV, as follows: 1. Asphalt overlay with MAS16-type asphalt concrete and MAS16 with correction of unevenness: a) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; - DN 6 km 343+200 - 370+500 technical class 2; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm, applies to: - all bridge surfaces and 10 m at the ends of the approaches; - areas at intersections with paved side roads. 2. Asphalt overlay with BA16-type asphalt mixture and BA16 with correction of unevenness: a) Overlay with BA16-type asphalt mixture, 4cm thick + a leveling layer for correcting unevenness with an average thickness of 2cm; Applies to: - DN 67D km 85+825 - 89+700 technical class 4; - DN 57 km 25+000 - 38+000 technical class 4; 50+070 - 52+500 technical class 4; b) Overlay with MAS 16-type stabilized asphalt mixture, 4cm thick, preceded by milling to an average depth of 4cm: - all bridge surfaces and 10 m at the ends of the approaches. The technical quality conditions for each type of asphalt overlay are included in the “SPECIFICATIONS FOR PERIODIC MAINTENANCE WORKS, GENERAL REQUIREMENTS FOR THE EXECUTION OF ASPHALT OVERLAYS”. On the road sections where asphalt overlays will be laid, permanent thick-layer road markings (thermoplastic) will be applied, preceded by temporary thin-layer markings. Road markings are intended to organize traffic and warn or guide road users and may be used independently or in combination with other signaling means to reinforce or clarify their meaning. The technical quality conditions for road markings are included in the “SPECIFICATIONS for ‘Road-marking works carried out on the national road and motorway network’”. For traffic safety, the “Methodological Rules issued by the Ministry of Internal Affairs and the Ministry of Transport under no. 1112/411 of 04.04.2000 and no. 08.06.2000” concerning the conditions for closing traffic and imposing traffic restrictions in order to carry out works in the public-road area shall be observed. During the works, the work sites will be appropriately signposted, and traffic will be directed by traffic controllers while the works are being carried out. Procedure: open. Estimated value: 409,966,039.17 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.