Romania – Highway maintenance work – “Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 1 S.D.N. Arad, Lot 2 S.D.N. Caransebeș, Lot 3 S.D.N. Deva, Lot 4 S.D.N. Timișoara, Lot 5 A1 Motorway Cunța-Ilia, Lot 6 A1 Motorway Ilia-Remetea, Lot 7 A1 Motorway Remetea Mare-Nădlac”
Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 1 S.D.N. Arad, Lot 2 S.D.N. Caransebeș, Lot 3 S.
Opportunity description
Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 1 S.D.N. Arad, Lot 2 S.D.N. Caransebeș, Lot 3 S.D.N. Deva, Lot 4 S.D.N. Timișoara, Lot 5 A1 Motorway Cunța-Ilia, Lot 6 A1 Motorway Ilia-Remetea, Lot 7 A1 Motorway Remetea Mare-Nădlac Deadlines for the submission of/responses to requests for clarifications/additional information: A. In accordance with the provisions of Art. 160 para. (1) of Law No. 98/2016, as subsequently amended and supplemented, the deadline by which any interested economic operator has the right to request clarifications or additional information in connection with the procurement documentation is the 20th day before the deadline for submission of tenders. B. In accordance with the provisions of Art. 160 para. (2) of Law No. 98/2016, as subsequently amended and supplemented, the deadline by which the contracting authority will respond clearly and completely to all requests for clarifications/additional information is the 11th day before the deadline for submission of tenders. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 1 S.D.N. Arad, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 1 S.D.N. Arad,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 2 S.D.N. Caransebeș, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 2 S.D.N. Caransebeș,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 3 S.D.N. Deva, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 3 S.D.N. Deva,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 4 S.D.N. Timișoara, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 4 S.D.N. Timișoara,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 5 A1 Motorway Cunța-Ilia, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 5 A1 Motorway Cunța-Ilia,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 6 A1 Motorway Ilia-Remetea, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 6 A1 Motorway Ilia-Remetea,” Annex No. 2 to the Specifications. Framework agreement for routine summer maintenance work on the carriageway, shoulders, emergency lanes and edge strips - D.R.D.P. Timișoara, period year I - year IV - Lot 7 A1 Motorway Remetea Mare-Nădlac, in accordance with the requirements set out in the Specifications. The estimated minimum and maximum quantities for the duration of the framework agreement, as well as the minimum and maximum quantities that could be covered by a single subsequent contract, are listed in the “Consolidated quantity schedule for maintenance work on the carriageway, shoulders, emergency lanes and edge strips - Lot 7 A1 Motorway Remetea Mare-Nădlac,” Annex No. 2 to the Specifications. Procedure: open. Estimated value: 119,693,857.4 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.