Romania – Roundabout construction work – Preparation of the Technical Design and Execution of Works for the Bucharest Ring Motorway, km 0+000 – km 100+900, North Ring sector km 0+000 - 52+770 (Ensuring all traffic connections at the DN7 road junction (km 9+400) with the A0 Motorway)
The subject of the contract is the Preparation of the Technical Design and Execution of Works for the Bucharest Ring Motorway, km 0+000 – km 100+900, North Ring sector km 0+000 - 52+770 (Ensuring all traffic connections at the road junction o
Opportunity description
The subject of the contract is the Preparation of the Technical Design and Execution of Works for the Bucharest Ring Motorway, km 0+000 – km 100+900, North Ring sector km 0+000 - 52+770 (Ensuring all traffic connections at the DN7 road junction (km 9+400) with the A0 Motorway), in accordance with the provisions of the works contract. In accordance with the provisions of Art. 160 para. (1) of Law No. 98/2016, as subsequently amended and supplemented, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information regarding the tender documentation is 25 days before the deadline for submission of tenders. In accordance with the provisions of Art. 160 para. (2) of Law 98/2016, as subsequently amended and supplemented, the Contracting Authority establishes a single deadline by which it will respond to all requests for clarification/additional information, as follows: 12 days before the deadline for submission of tenders. The deadline for responding to clarifications was established so that economic operators have an adequate period to analyze the tender documentation and, subsequently, to prepare their tenders in light of the responses provided by the Contracting Authority. The subject of the contract is the Preparation of the Technical Design and Execution of Works for the Bucharest Ring Motorway, km 0+000 – km 100+900, North Ring sector km 0+000 - 52+770 (Ensuring all traffic connections at the DN7 road junction (km 9+400) with the A0 Motorway), in accordance with the provisions of the works contract. In accordance with the contractual provisions, namely Government Decision No. 1/2018, any modifications that may occur during the contract implementation period relate to the following, without being limited thereto: 1. Modifications to the contracting parties, including replacement of the contractor with a new contractor under the conditions provided for in Art. 221 para. (1) letter d), point (ii); 2. Change of the company name and/or legal form, changes that do not result in the creation of a new legal person; 3. Modifications resulting from adapting the Technical Execution Design to the actual site conditions, including changes to specific technical solutions; 4. Modifications resulting from changes/adaptations to the elevations, positions and/or dimensions of certain works due to site conditions; 5. Modifications generated by requirements of the environmental authorities; 6. Modifications resulting from the need to move/relocate certain objects located on/in the ground/subsoil; 7. Modifications generated by the inclusion of new subcontractors/suppliers/subcontractors of subcontractors/any other economic operators and/or generated by the replacement of the initial subcontractors/suppliers/subcontractors of subcontractors/any other economic operators, which will be carried out in accordance with the corresponding clause of the General Conditions of Contract; 8. Modifications generated by changes to key personnel/other personnel, which will be carried out in accordance with the corresponding clause of the General Conditions of Contract; 9. Modifications to the expropriation route/corridor that result in the need to carry out additional works and/or to discontinue certain works included in the Contract; 10. Modifications generated by agreements, conventions, arrangements of the state/local authorities with other states; 11. Legislative changes or changes to technical rules/STAS standards/regulations/standards during contract implementation, which will be made in accordance with the corresponding clause of the General Conditions of Contract, in compliance with the provisions of Art. 221 of Law No. 98/2016, as subsequently amended and supplemented; 12. Extension of the Execution Period based on the contractual mechanism provided for in Clause 35 [Extension of the Execution Period] of the General Conditions, without prejudice to the Beneficiary's right to impose on the Contractor the penalties and/or sanctions provided for in the contract; 13. Modifications resulting from implementing requests received from various institutions/authorities/entities with responsibilities related to the investment objective (for example: Ministries, JASPERS, central and/or local Authorities/Institutions, Certified Verifiers, control bodies, etc.). 14. Modifications generated by changes to the terrain and the above-ground and underground hydrographic network that were unknown on the date the Technical Execution Design was prepared; The modifications will be made after the contract is signed, in accordance with the contractual provisions, only provided that they do not constitute substantial modifications within the meaning of Art. 221 para. (7) of Law No. 98/2016. The Execution Period will be extended in accordance with the provisions of Clause 35 [Extension of the Execution Period] of the General Conditions. Further information can be found in the Contract. Procedure: open. Estimated value: 41,037,682 RON. Review the original TED notice for the complete requirement, lots, amendments and attachments.