Spain – Operation of a water-purification plant – Maintenance and transitional operation of the alternative supply facilities for the El Tejo reservoir to guarantee resource availability for the municipality of El Espinar and the Mancomunidad de La Mujer Muerta
The tasks included in the subject matter of the contract consist of carrying out each and every one of the works aimed at enabling the maintenance and operation of the pumping infrastructure of the Puente Alta reservoir, which incl
Opportunity description
The tasks included in the subject matter of the contract consist of carrying out each and every one of the works aimed at enabling the maintenance and operation of the pumping infrastructure of the Puente Alta reservoir, which includes, among others, the operation, control, supervision and maintenance necessary to guarantee the continuous and safe transport of fluids at the station, fuel management, the provision of two generator sets, and the repair and/or replacement of elements in poor condition along the route of the pipeline through which the pumped water will flow. Procedure: open. Estimated value: 1,148,396.03 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.