Switzerland – Boiler installations – EBP-671 Replacement of Final Superheater 3 for HHKW
With this procurement for the wood-fired power plant (HHKW) at the Forsthaus Energy Center (EZF), Energie Wasser Bern intends to replace the existing superheater tubes of superheaters 3 and 2b. The superheater tubes will reach their maximum technical service life in the next
Opportunity description
With this procurement for the wood-fired power plant (HHKW) at the Forsthaus Energy Center (EZF), Energie Wasser Bern intends to replace the existing superheater tubes of superheaters 3 and 2b. The superheater tubes will reach their maximum technical service life in approximately the next 2 years and must therefore be replaced. Superheaters 3 and 2b consist of 2 packages, each with 31 tube coils, with a total weight of approximately 7000 kg of boiler tubes with a diameter of 38 mm. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.