Switzerland – Building installation work – MCRE04 - CABLING - Saunerie WWTP in Colombier
Contract MCRE04 concerns the installation of high-current (CFO) and low-current (CFA) electrical systems, the main low-voltage switchboard (TGBT), lighting, motive power, and the power supply for process equipment
Opportunity description
Contract MCRE04 concerns the installation of high-current (CFO) and low-current (CFA) electrical systems, the main low-voltage switchboard (TGBT), lighting, motive power, the power supply for process equipment such as valves, pumps, flowmeters, etc., as well as universal copper cabling (CUC), fiber optics (FO), and fire detection for all wastewater treatment buildings, with the exception of the future operations building. It also includes the cabling and connection of equipment installed by the holders of the process contracts, the supply of all necessary equipment, including cable trays, trunking, and conduits, as well as lighting, electrical outlets, marking, installation, connections, testing, documentation, and approval. Contract MCRE04 also includes bringing the buildings and installations into compliance with requirements concerning lightning protection, grounding, and equipotential bonding. Finally, contract MCRE04 includes comprehensive services, comprising studies, installation, and approval, relating to access control and fire protection at the Saunerie WWTP. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.