Switzerland – Construction work – EPFL ASB – AO 13 – CFC 249 COMMON SUPPORT SYSTEM
The EPFL Advanced Science Building (ASB) project aims to create a complex of very high-tech laboratories meeting strict requirements regarding vibrations, electromagnetic fields, thermal stability, and h
Opportunity description
The EPFL Advanced Science Building (ASB) project aims to create a complex of very high-tech laboratories meeting strict requirements regarding vibrations, electromagnetic fields, thermal stability, and hygrometric control. Located on the campus, on the site of the current Route J.-D. Colladon parking lot, it will accommodate facilities that cannot be housed in the existing buildings. For more information about the project, please consult the link below: https://www.epfl.ch/about/philanthropy/fr/soutien-aux-nouveaux-batiments/advanced-science-building/ <https://www.epfl.ch/about/philanthropy/fr/soutien-aux-nouveaux-batiments/advanced-science-building/>. The subject of this contract concerns the design, supply, and installation of a common support system intended for the technical installations of the Advanced Science Building (CFC 249). For more information about this contract, please consult the specifications and their annexes. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.