Switzerland – Construction work for school buildings – New construction of the Wolhusen school building, Butzenstrasse 4, 8910 Affoltern am Albis: BKP 248 Building automation
The building extends from the 2nd basement floor to the 4th upper floor. The basement floors contain a gymnasium, changing rooms, technical rooms and ancillary rooms. Classrooms, group rooms and multipurpose rooms are arranged from the ground floor to the 4th upper floor. The building automation controls the
Opportunity description
The building extends from the 2nd basement floor to the 4th upper floor. The basement floors contain a gymnasium, changing rooms, technical rooms and ancillary rooms. Classrooms, group rooms and multipurpose rooms are arranged from the ground floor to the 4th upper floor. The building automation controls the heating with district heating, the cooling with the refrigeration machine, and three ventilation systems. Various room groups are regulated variably and according to demand by the room automation. A building management system is used to adjust parameters and for visualization. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.