Switzerland – Construction work – MP-230042 NEB N13 Magadino-Ascona Pavement, Lot 201, construction contractor and paving works
The project concerns the rehabilitation of the pavement on the N13 motorway section between the Magadino airport roundabout (km 201,300 excluded) and Ascona (km 220,900). Main planned quantities: Pavement milling: approx. 170 000 m² Tran
Opportunity description
The project concerns the rehabilitation of the pavement on the N13 motorway section between the Magadino airport roundabout (km 201,300 excluded) and Ascona (km 220,900). Main planned quantities: Pavement milling: approx. 170 000 m² Transport and disposal of milled asphalt: approx. 37 000 t Earthworks and foundation layers in granular mixture: approx. 3 200 m³ Levelling: approx. 18 000 m² SAMI: approx. 78 000 m² Replacement of expansion joints: approx. 160 m Road markings: approx. 75 000 m and 6 500 m² Bituminous mixtures: approx. 37 000 t The work will mainly be carried out at night The project concerns the rehabilitation of the pavement on the N13 motorway section between the Magadino airport roundabout (km 201.300 excluded) and Ascona (km 220.900). Main planned quantities: Pavement milling: approx. 170'000 m² Transport and disposal of milled asphalt: approx. 37'000 t Excavations and subbases in granular mixture: approx. 3'200 m³ Formation level: approx. 18'000 m² SAMI: approx. 78'000 m² Replacement/renewal of expansion joints: approx. 160 m Road markings: approx. 75'000 m and 6'500 m² Bituminous mixtures: approx. 37'000 t The work will be carried out mainly at night. Procedures: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.