Switzerland – Construction work – Relocation of Waldegg stop: Building contractor
Sihltal Zürich Uetliberg Bahn SZU AG plans to relocate its Uitikon-Waldegg stop in 2027 and 2028 in order to comply with the requirements of the Disability Equality Act (BehiG). The old platform will be demolished
Opportunity description
Sihltal Zürich Uetliberg Bahn SZU AG plans to relocate its Uitikon-Waldegg stop in 2027 and 2028 in order to comply with the requirements of the Disability Equality Act (BehiG). The old platform will be demolished and rebuilt approximately 80m uphill, while rail operations must remain largely assured. The relocation will require a retaining wall up to 5m high and approximately 125m long, including a ramp structure to the neighboring residential street. In order for the platform edge to be raised to P55, the track alignment must be shifted at the same time. As part of the project, two adjacent level crossings will also be renewed with barrier systems, signal masts and new cable connections, and various utility lines will be relocated for the construction of the retaining wall, including track crossings. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.