Switzerland – Electrical installation work – Complete renovation, VS Stöckacker, BKP 230 electrical installations
Complete renovation of the 4 existing school buildings at Bienenstrasse 5-11: School Buildings II+I at Bienenstrasse 5+9, neighborhood building and gymnasium at Bienenstrasse 7+11. Existing HV in the basement of Bienestrasse 7, new connection from the new building.
Opportunity description
Complete renovation of the 4 existing school buildings at Bienenstrasse 5-11: School Buildings II+I at Bienenstrasse 5+9, neighborhood building and gymnasium at Bienenstrasse 7+11. Existing HV in the basement of Bienestrasse 7, new connection from the new building. Replacement of the electrical connection from the HV to the existing UV in School Buildings I+II. Replacement of the lighting. Planned systems: BMA, NLA, PVA by ewb, GLS, KNX (blinds), constant light control, AMOK, EVAK. Heating by means of district heating (already installed), hot water by means of fresh-water stations and heat-pump boilers, exhaust-air systems in the WCs, ventilation system in the basement of the neighborhood building and ventilation system for the changing rooms in the gymnasium. More precise details can be found in the attached construction description. Product/brand/design or type designations are omitted. Should such designations be listed in exceptional cases, equivalent alternatives are permitted. Equivalence must be demonstrated by the tenderer. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.