Switzerland – Electrical installation work – Monteceneri (TI) New MZR Medical Center, CCC 23 Electrical work
The construction of a new regional medical center is planned – Monteceneri Military Training Area Electrical work Main quantities: * Assembled switchgear: 6 units * Photovoltaic panels: 160 units * Inverters:
Opportunity description
The construction of a new regional medical center is planned – Monteceneri Military Training Area Electrical work Main quantities: * Assembled switchgear: 6 units * Photovoltaic panels: 160 units * Inverters: 2 units * CF and CD conduits: 4,500 m * Standard and safety cable ducts: 1,300 m * Power cables: 3,200 m * Fiber-optic, control and communication cables: 5,900 m * Installation of third-party devices (lighting): 350 pieces * CF devices: 450 pieces * CD devices: 830 pieces The construction of a new regional medical center is planned – Monteceneri Military Training Area Electrical work Main quantities: * Assembled switchgear: 6 pcs * Photovoltaic panels: 160 pcs * Inverters: 2 pcs * CF and CD conduits: 4500m * Standard and safety cable ducts: 1300 m * Power cables: 3200 m * Fiber-optic, control and communication cables: 5900 m * Installation of third-party devices (lighting): 350 pcs * CF devices: 450 pcs * CD devices: 830 pcs Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.