Switzerland – Erection and related works of roof frames and coverings – Complete renovation, VS Stöckacker, BKP 214 prefabricated timber construction
As part of the roof renovation of the school buildings (BN 5-9), the existing roof covering will be removed by the timber construction contractor. The asbestos-contaminated sub-roof will be dismantled on site by a specialist contractor and is not part of thi
Opportunity description
As part of the roof renovation of the school buildings (BN 5-9), the existing roof covering will be removed by the timber construction contractor. The asbestos-contaminated sub-roof will be dismantled on site by a specialist contractor and is not part of this procurement; the contractor will take over the approved substrate after the corresponding inspection. This will be followed by the structural reinforcement measures on the roof and the construction of a load-bearing roof diaphragm. The new roof structure comprises insulation between the rafters, a new vapor-permeable sub-roof, counter-battens, and the repair or reconstruction of the cornices. For the gymnasium (BN 11), the scope of work is analogous but expanded: In addition to the removal of the roof covering and the asbestos-contaminated sub-roof (by others), reinforcement measures must be carried out on the roof, beam structure, and trusses. Both a roof diaphragm and a ceiling diaphragm will be constructed, supplemented by insulation, sub-roof, counter-battens, and cornices as in the school buildings. Product/brand/design or type designations are not used. Should such designations exceptionally be listed, equivalent alternatives are permitted. Equivalence must be demonstrated by the bidder. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.