Switzerland – Transformer substation – Masonry work for an HV/MV electrical substation
The project consists of the construction of the new Vaucens electrical substation, located on plot no. 3311 in the municipality of Bulle, owned by Gruyère Energie SA, approximately 250 m from the existing Etang electrical substation. Ultimately, the new substation
Opportunity description
The project consists of the construction of the new Vaucens electrical substation, located on plot no. 3311 in the municipality of Bulle, owned by Gruyère Energie SA, approximately 250 m from the existing Etang electrical substation. Ultimately, the new substation will fully replace the Etang substation. The new building will be intended to house, in particular, high- and medium-voltage installations, comprising 72.5 kV switchgear operated at 60 kV, 24 kV switchgear operated at 18 kV, two 64.2/21.5-18.7 kV, 31.5 MVA power transformers, as well as a reserve bay for a third transformer. The building will also incorporate the premises and installations required for the substation's auxiliary services and control systems. This contract concerns the masonry work required for the construction of the new Vaucens electrical substation. The services include, in particular, structural and masonry work related to the construction of the building and its infrastructure, in accordance with the plans, technical specifications, and tender documents. The work must take into account the specific constraints associated with the construction of a high- and medium-voltage electrical substation, as well as coordination with the other trades and suppliers of electrotechnical equipment. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.