Switzerland – Ventilation installation work – Energy performance actions (APE) for the buildings of the CHUV hospital campus - Upgrade work on air treatment installations CFC 242, 244, 246 Heating Ventilation Air Conditioning
This contract includes the upgrading of hot- and cold-water hydraulic peripherals for the following 3 lots: * Project PT01: Refurbishment and complete redesign of the air handling unit plant of the BH building, level 03 (BH
Opportunity description
This contract includes the upgrading of hot- and cold-water hydraulic peripherals for the following 3 lots: * Project PT01: Refurbishment and complete redesign of the air handling unit plant of the BH building, level 03 (BH03) * Project MAT07: Upgrading of the air extraction installations (LT 7004_LT 7018_LT 7099) on level 7 of the Maternity building (MAT07) * Project GP16 and GP 41: Upgrading of the GP41 and GP 16 LT installations on level 6 of the BH building (BH06) The project includes: * The upgrading of hot- and cold-water hydraulic peripherals as part of the upgrades to the HVAC installations: See CFC 242, CFC 246 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The upgrading of steam hydraulic peripherals as part of the upgrades to the HVAC installations: CFC 242.1 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The phased upgrading of the ventilation installations: CFC 244→ CVR description, Engineers' conditions (air systems), price schedule, appendices for the PT01 ventilation installations on levels 3 & 4 of the BH hospital building The project includes: * The upgrading of hot- and cold-water hydraulic peripherals as part of the upgrades to the HVAC installations: See CFC 242, CFC 246 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The upgrading of steam hydraulic peripherals as part of the upgrades to the HVAC installations: CFC 242.1 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The phased upgrading of the ventilation installations: CFC 244→ CVR description, Engineers' conditions (air systems), price schedule, appendices for the air extraction installations in technical rooms 7004, 7018, 7099 The project includes: * The upgrading of hot- and cold-water hydraulic peripherals as part of the upgrades to the HVAC installations: See CFC 242, CFC 246 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The upgrading of steam hydraulic peripherals as part of the upgrades to the HVAC installations: CFC 242.1 → CVR description, Engineers' conditions (hydraulics), price schedule, appendices * The phased upgrading of the ventilation installations: CFC 244→ CVR description, Engineers' conditions (air systems), price schedule, appendices for the GP16 and GP 41 ventilation installations on level 6 of the BH building (BH06). Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.